02-20-2016, 07:50 AM
(02-20-2016, 12:03 AM)Pheidippides Wrote: The east-west connection is on Kitchener's master plan from 2012.
I last saw it referenced in the Iron Horse Trail survey as a "primary proposed type 1" trail (whatever that is) but both maps show it north of the tracks not south like in the new site plan.
Thanks for the links!