10-11-2014, 10:03 AM
I think there is a lot of work ahead for GO/Metrolinx. Running all-day two-way service all along the line probably needs two tracks and a lot of other infrastructure to get built first along with scheduling and space at Union Station for all the trains. GO might as well electrify at the same time and if they are actually going to electrify the entire GO system at the same time it's going to take a lot of work and time.
I was glad to see support for the Cambridge LRT being mentioned.
I was glad to see support for the Cambridge LRT being mentioned.