(05-14-2024, 02:50 PM)SF22 Wrote:(05-14-2024, 02:16 PM)neonjoe Wrote: The road was rebuilt in a manner that its prepared for centre running LRT. Utilities were replaced and the median was designed so that it could upgraded to allow for centre running LRT without tearing the entire road out again.
This is exactly it. It's actually good planning, looking forward to known projects that are coming down the pipeline, even if the interim stage feels a little wrong.
I assumed the future LRT was at least part of the planning process which is GOOD planning I agree. Absolutely no reason you can't, at minimum, put grass in the middle in the meantime, especially because the LRT feels like a pipe dream at this point. Eglington has a GRASS LRT for what it's worth. So I'm glad the median was put in place, but that doesn't negate concrete being a horrible and hostile choice.