(02-07-2023, 08:53 PM)nms Wrote: Per this line from the article, what further realignment are they doing on the tracks that they missed when they did the grade separations?
Quote:"The design work will be done concurrently with work Metrolinx needs to do to realign the current Via Rail corridor."
Further east? The tracks are no longer straight since construction already done — they jog over a bit. Maybe they’ll straighten them out somewhat. On the other hand, presumably they’re not moving where they are at Weber St. so I don’t know.