(04-21-2022, 05:17 PM)Serendipity Wrote: When I did a walk through at the end of Feb, my unit was very warm so it's surprising to me that the pipes would freeze.
(04-21-2022, 03:14 PM)skyrise32 Wrote: The building is fully enclosed, at this point mechanical systems are functioning heating the building. You cannot do any other finishing in below zero temps such as tape, paint, tile etc.
Not suggesting it was the case, just giving my interpretation of Tom's post. But interesting to hear nonetheless.
Although now I'm curious, can heat be turned on floor by floor before the tower is fully enclosed? i.e. are floors reasonably insulated from each other? I was under the impression on taller buildings that work begins finishing lower units before the entire tower is enclosed.