Welcome Guest!
In order to take advantage of all the great features that Waterloo Region Connected has to offer, including participating in the lively discussions below, you're going to have to register. The good news is that it'll take less than a minute and you can get started enjoying Waterloo Region's best online community right away.
or Create an Account




Thread Rating:
  • 9 Vote(s) - 3.67 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Vertikal (471-481 King St E) | 23 & 19 fl | U/C
COVID discussions moved to the COVID thread. Smile
Reply


Is there parking in the podium?
Reply
(09-09-2020, 11:08 AM)Spokes Wrote: Is there parking in the podium?
Yeah there's parking in the center of the podium, they didn't go deep enough for all the parking to be underground.
Reply
That's what I thought, thanks for clarifying.
Reply
There must be a problem with the tower crane. They have had a mobile crane moving forms for the King St tower for the last 2 weeks
Reply
And mobile crane is still there. No sign of the tower crane being disassembled for repair yet.
Reply
(10-07-2020, 03:51 PM)tomh009 Wrote: And mobile crane is still there. No sign of the tower crane being disassembled for repair yet.
Signs up between Cedar and Cameron saying King will be closed for two days October 13th. 

Perhaps something happening then?
Reply


Yes, sounds like a crane repair.
Reply
(10-09-2020, 10:33 AM)tomh009 Wrote: Yes, sounds like a crane repair.

the city website says its for Kitchener Wilmot hydro so maybe not crane repair.
Reply
(10-09-2020, 10:41 AM)ZEBuilder Wrote:
(10-09-2020, 10:33 AM)tomh009 Wrote: Yes, sounds like a crane repair.

the city website says its for Kitchener Wilmot hydro so maybe not crane repair.

Maybe the issue was with electric to the crane.
Reply
Not much happening:

[Image: YnDKM8D.jpg]
Reply
Mammoet has a crane setting up on King. Not sure if it is for KW hydro or Drewlo
Reply
(10-19-2020, 04:47 PM)white_brian Wrote: Mammoet has a crane setting up on King.  Not sure if it is for KW hydro or Drewlo

Drewlo is supposed to be two cranes. But currently only one, and even that one doesn't appear to be functional.
Reply


(10-19-2020, 07:52 PM)tomh009 Wrote:
(10-19-2020, 04:47 PM)white_brian Wrote: Mammoet has a crane setting up on King.  Not sure if it is for KW hydro or Drewlo

Drewlo is supposed to be two cranes. But currently only one, and even that one doesn't appear to be functional.

could they be using this week to put up the one and fix the other?
Reply
Does anyone have a copy of the construction proposal drewlo submitted?
Reply
« Next Oldest | Next Newest »



Forum Jump:


Users browsing this thread: 14 Guest(s)

About Waterloo Region Connected

Launched in August 2014, Waterloo Region Connected is an online community that brings together all the things that make Waterloo Region great. Waterloo Region Connected provides user-driven content fueled by a lively discussion forum covering topics like urban development, transportation projects, heritage issues, businesses and other issues of interest to those in Kitchener, Waterloo, Cambridge and the four Townships - North Dumfries, Wellesley, Wilmot, and Woolwich.

              User Links