In order to take advantage of all the great features that Waterloo Region Connected has to offer, including participating in the lively discussions below, you're going to have to register. The good news is that it'll take less than a minute and you can get started enjoying Waterloo Region's best online community right away.
or Create an Account




Thread Rating:
  • 15 Vote(s) - 3.93 Average
  • 1
  • 2
  • 3
  • 4
  • 5
ION - Waterloo Region's Light Rail Transit
(09-20-2017, 04:28 PM)GtwoK Wrote:
(09-19-2017, 10:58 PM)Pheidippides Wrote: The placement of this crossing at just north of Father David Bauer at Caroline will forever be horrible, but at least they are making VERY slow progress on fixing the lack of curb cuts. First they painted the place to cut the curb. A few months later they cut the curb. A few months later they have removed the dirt and are preparing a to frame the space for a concrete pour:


I saw them installing these curb and reflective pieces today on both sides of King where the spur line rail crosses. I guess it is to try and stop people from driving/walking/cycling along the rails?

Thank GOD. So sick of seeing this:

[Image: X6ISjMy.jpg]

Why is the freight portion of this so wide, anyway? Or paved, for that matter? Freight doesnt need that much room, and people doing this wouldn't have been possible if they had made the freight ROW just as wide as the LRT ROW
I've wondered the same thing.  It looks as though the rail ROW is part of the drive aisle.
Reply


The temporary wooden structure on the Weber St. Bridge is coming down!

It reveals what it was: wooden forms for a concrete pour.

   

   

   

   

And, one close-up of some of the switches in the yard.

   
Reply
What's the deal with the Weber St bridge? The official closure is between Dutton Parkside and Albert and the LRT naysayers believe the concrete poured means the system is still being built. Was that supposed to be ready in July?
Reply
(09-20-2017, 10:38 PM)Bob_McBob Wrote: What's the deal with the Weber St bridge? The official closure is between Dutton and Albert and the LRT naysayers believe the concrete poured means the system is still being built. Was that supposed to be ready in July?

The Weber St. bridge work is entirely unrelated to the LRT work, it's rehabilitation of a 60 year old bridge that happens to go over a railway which happens to have been re purposed as part of the LRT.

I don't know the timeline on that work, or even why it would involve closing the road....(All of the topside surface reconstruction isn't happening for at least a year or two).
Reply
What's the ION construction happening between Dutton Parkside and Albert?
Reply
Just adding permanent safety fences on both sides, to prevent anyone from getting too close to the OCS (or throwing stuff at trains).
It just so happens Aecon got the contract for the rehabilitation work - and they're also a GrandLinq partner. So, some efficiencies are there in having them do the work all together.
Reply
(09-21-2017, 04:50 AM)Canard Wrote: Just adding permanent safety fences on both sides, to prevent anyone from getting too close to the OCS (or throwing stuff at trains).
It just so happens Aecon got the contract for the rehabilitation work - and they're also a GrandLinq partner. So, some efficiencies are there in having them do the work all together.

Yeah one less contractor to train as all work on or near the tracks requires at minimum about a days worth of various in class training/info sessions for all workers.  All work on/near the tracks require work permits completed and approved around a week in advance of the work being performed, lock out tag out, etc.  Likely lots of efficiency to be had.
Reply


(09-21-2017, 04:50 AM)Canard Wrote: Just adding permanent safety fences on both sides, to prevent anyone from getting too close to the OCS (or throwing stuff at trains).
It just so happens Aecon got the contract for the rehabilitation work - and they're also a GrandLinq partner. So, some efficiencies are there in having them do the work all together.

Do you understand the concrete work under the bridge?
Reply
What work is actually remaining other than integrating signalling and trains? Someone on Facebook mentioned concrete pouring in multiple sections of Courtland, a rail excavator operating between Mill St and Hayward, and various welding, basically saying the tracks are far from completion.
Reply
A walk through the Downtown loop with a close eye will show you various points that are incomplete - small patches of concrete that are removed for various adjustments and repairs.

None of it is very extensive, but there are several areas with them.
Reply
(09-21-2017, 09:01 AM)Bob_McBob Wrote: What work is actually remaining other than integrating signalling and trains? Someone on Facebook mentioned concrete pouring in multiple sections of Courtland, a rail excavator operating between Mill St and Hayward, and various welding, basically saying the tracks are far from completion.

I don't know, I haven't seen it, but when I walked down there a few weeks ago, they appeared completed.
Reply
(09-20-2017, 07:53 PM)YKF Wrote:
(09-20-2017, 04:28 PM)GtwoK Wrote: Thank GOD. So sick of seeing this:

[Image: X6ISjMy.jpg]

Why is the freight portion of this so wide, anyway? Or paved, for that matter? Freight doesnt need that much room, and people doing this wouldn't have been possible if they had made the freight ROW just as wide as the LRT ROW
I've wondered the same thing.  It looks as though the rail ROW is part of the drive aisle.

We eat at Famosa somewhat often and I've been confused too. Piles of people walk, drive and bike down the paved stretch. Watched an elderly couple struggle to walk down the drop at the ION station coming out of the mall. It's not obvious at all whether or not you can walk there. 

Also while eating there Sunday night the signals all along that stretch when haywire. Arms stuck halfway down, lights and bells going off, the traffic on Caroline and Erb was stopped for a bit too - no train in sight.
Reply
Why isn't that section in concrete?
Reply


(09-21-2017, 09:07 PM)JoeKW Wrote: Why isn't that section in concrete?

None of the freight track is embedded. It’s all ballasted, including underneath that asphalt — it’s built exactly like a very long level crossing. At Erb and Caroline, the two tracks are built quite differently.

Which doesn’t really answer your question, but spreads it out to a more general question about the difference between the construction of the freight track and the LRT-only track.

I figure they should have used another gauntlet track segment there and reserved the area currently used by the freight track for the trail. The curve might have been tricky however — as constructed the LRT goes straight through the station then curves relatively sharply, while the freight track curves more gradually. I don’t think that’s a show-stopper, given that the overall design could have been slightly different, but it might not have been quite as simple as I make it sound.
Reply
(09-21-2017, 09:18 PM)ijmorlan Wrote:
(09-21-2017, 09:07 PM)JoeKW Wrote: Why isn't that section in concrete?

None of the freight track is embedded. It’s all ballasted, including underneath that asphalt […]

So the question becomes — why is it paved?
Reply
« Next Oldest | Next Newest »



Forum Jump:


Users browsing this thread: 73 Guest(s)

About Waterloo Region Connected

Launched in August 2014, Waterloo Region Connected is an online community that brings together all the things that make Waterloo Region great. Waterloo Region Connected provides user-driven content fueled by a lively discussion forum covering topics like urban development, transportation projects, heritage issues, businesses and other issues of interest to those in Kitchener, Waterloo, Cambridge and the four Townships - North Dumfries, Wellesley, Wilmot, and Woolwich.

              User Links