In order to take advantage of all the great features that Waterloo Region Connected has to offer, including participating in the lively discussions below, you're going to have to register. The good news is that it'll take less than a minute and you can get started enjoying Waterloo Region's best online community right away.
or Create an Account




Thread Rating:
  • 15 Vote(s) - 3.93 Average
  • 1
  • 2
  • 3
  • 4
  • 5
ION - Waterloo Region's Light Rail Transit
The "other location" is where the pump and line reservoir go. In some cases, one reservoir & pump box will feed two lubricators. In those cases, the box will be located midway between them.
Reply


(07-20-2016, 03:00 AM)Canard Wrote: Hang on a minute!
...
For most people, the "Pilot vehicle" will be indistinguishable from the finished train. Maybe the interior in all the modules won't be totally fitted out. Or the paint job may not be finished. Or a few exterior panels might be missing.
I think those kinds of things are exactly what BuildingScout meant.

Quote:What I don't fully understand is what/where Metrolinx is planing to play with their 2 Pilot trains. They have no trackwork that they can do so on anywhere in Toronto. All of their streetcar lines are built to 1495 mm gauge (1435 mm is standard) so they're incompatible.

It'd be nice if the Region and Metrolinx could come to an agreement to let them play with their trains here this fall. I'd personally be very happy with that. Big Grin
Back in ye olden times, there was talk that, since these are all the same vehicles anyway, that testing for the trains would happen here in Waterloo.  It's been a little muddy, what with they way they keep getting talked about in the press as completely different things.

I think this stratification of the PR into into "Waterloo LRT vehicles" and "Metrolinx vehicles" has just been a consequence of Waterloo Region press/politicians asking about the former, and Toronto press/politicians asking about the latter, and Bombardier telling them each about their own order in isolation.  
Waterloo gets told "Pilot vehicle in October, 3 months of testing, production vehicles in 2017." (I can't remember the actual dates, I just made those up)
Toronto gets told "Pilot vehicle this year, 18 months of testing, production vehicles in 2019."
In reality, it's "Pilot vehicle in October, 3 months of testing, Waterloo vehicles enter main production in 2017, pilot vehicle continues testing, any further issues found are fixed by the time the Metrolinx order begins production in 2019"
Reply
I'm not quite sure what you're getting at.

As I've said before:

Bombardier makes trains 1 and 2. Those are Metrolinx' and they're their "Pilot Trains". The first of which will be done in August, and head to Millhaven.

Train 3 is our train 1. It also goes to Millhaven, and then comes here in December. Bombardier says "we're happy with how testing went at Millhaven, here's your train. Now you do your acceptance testing" and the Region starts into the tests and burn-in outlined in the Project Ageeement.

Ours is much more "off the shelf - this is what you get." The Metrolinx relationship is far more "give and take" and they'll get whatever they want for customization or changes, since it's such a huge order.

Same thing happened on the TTC FLEXITY Outlook order. Lots of ongoing tweaks and mods.

Same thing happened on the TTC Toronto Rocket (MOVIA) order. Lots of ongoing tweaks and mods.

Buying trains is totally different than buying buses, where you just say "I want 20 Nova LFS'" and they go "Ok, here" and it's done.
Reply
What leads you to believe that Waterloo won't have a visit from a test vehicle? (i.e. one of train 1 or 2)
Reply
I certainly hope that we will!

But they're not ours. They're Metrolinx'. GrandLinq is on a timeline and would have no drive or desire to risk missing a timeline and incurring a penalty because someone else was doddling or getting in the way.

If I were Metrolinx, I would be begging the Region to run trains here. Makes so much meow sense than sending a team to camp out at Millhaven for months. Toronto has nowhere to run their two trains.
Reply
They're Bombardier's!
Until they give them to Metrolinx. Smile

I fully expect one of those trains to be tested here as part of the run-up to building our fleet.
Reply
I hope you're right. But my information so far says otherwise.
Reply


1/5 - Wednesday, July 20, 2016

Normally I don't get to see anything going on during the day, and only catch snippets of actual work being performed when the guys are out working after-hours or on weekends.  Today, I slept terrible, went into work super early and took off earlier than usual and went for a big bike ride along the line.  It was totally worth it!

   
First up - Duke and Queen! Right as I arrived, they were just getting ready to start pouring concrete. 2 days ago, this was wiggly steel rails in the dirt!

   
I believe someone had asked a few days ago what the black stuff was on top of the rails, before a pour. Answer: It's more duct tape! Big, wide, black duct tape. This keeps the concrete out of the flangeway, and off the rail head.

   
Here comes the concrete!

   

   
About 50 folks were working at this particular intersection. I imagine there is some impetus to get this done, so Frederick can close.
Reply
2/5 - Wednesday, July 20, 2016

   
Over near the Transit Terminal, the Victoria Park platform got its anchor wall weldment frame today.

   
Benton and Charles is being paved.

   
On the Waterloo Spur, detail work is being performed on the catenary.  Here, a worker is removing the temporary caribener hangers, and replacing them with the permanent ones.

   
Then, this truck comes along - with a pantograph mockup!

   
The pantograph and the device labeled "BOOM 1" are used to set the position of the contact wire.
Reply
3/5 - Wednesday, July 20, 2016

   
A scale plate ("ruler") on the pantograph mockup allows the position of the contact wire to be precisely set laterally.

   
I tried to get a shot to show this as best I could - here, you can clearly see the "zig-zag" layout of the contact wire. This is by design - to guarantee that the contact wire won't wear a groove in the pantograph on the train as it moves along at high speed.

   
Dwarf signals at the South end of the R&T Park Station.

   
The yard track at the OMSF just gets crazier and crazier every day.

   
These are really funky switches - they're tight radius, so there's a restraining rail - I've never seen switches like these before.
Reply
4/5 - Wednesday, July 20, 2016

   
OMSF Overview.

   
Another close up of those funky switches.

   

   

   
Forms taking shape at the future Northfield platform.
Reply
5/5 - Wednesday, July 20, 2016

   
At Erb/Caroline, it's becoming fairly obvious where the freight alignment is going to go!

   
Back at Duke/Queen, an hour and a half later, they're all done.

   
The finishing touches.  And I thought King/Union was fast, at <2 weeks!  This must be a new record.


That's all for today, folks.  I'm pooped!
Reply
(07-20-2016, 12:20 PM)Canard Wrote: I certainly hope that we will!

But they're not ours. They're Metrolinx'. GrandLinq is on a timeline and would have no drive or desire to risk missing a timeline and incurring a penalty because someone else was doddling or getting in the way.

If I were Metrolinx, I would be begging the Region to run trains here. Makes so much meow sense than sending a team to camp out at Millhaven for months. Toronto has nowhere to run their two trains.

   
Reply


(07-20-2016, 05:27 PM)Canard Wrote: Benton and Charles is being paved.

Strange that they're paving it before adding int the Northbound rail crossing. Seemed like they were so close to doing that - why pave now?
Reply
Guess they're going it 'Gaukel' or 'Queen and Charles' style - pave, mark the guideway, pull up just that asphalt, and form and pour within the cut gap.
Reply
« Next Oldest | Next Newest »



Forum Jump:


Users browsing this thread: 65 Guest(s)

About Waterloo Region Connected

Launched in August 2014, Waterloo Region Connected is an online community that brings together all the things that make Waterloo Region great. Waterloo Region Connected provides user-driven content fueled by a lively discussion forum covering topics like urban development, transportation projects, heritage issues, businesses and other issues of interest to those in Kitchener, Waterloo, Cambridge and the four Townships - North Dumfries, Wellesley, Wilmot, and Woolwich.

              User Links