General Road and Highway Discussion - Printable Version +- Waterloo Region Connected (https://www.waterlooregionconnected.com) +-- Forum: Waterloo Region Works (https://www.waterlooregionconnected.com/forumdisplay.php?fid=14) +--- Forum: Transportation and Infrastructure (https://www.waterlooregionconnected.com/forumdisplay.php?fid=25) +--- Thread: General Road and Highway Discussion (/showthread.php?tid=335) Pages:
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
|
RE: General Road and Highway Discussion - tomh009 - 05-11-2020 Sorry, I meant that restriping at the time of repaving is better than restriping later. Didn't mean to imply that it's as good as properly separated bicycle lanes. RE: General Road and Highway Discussion - danbrotherston - 05-11-2020 (05-11-2020, 02:21 PM)tomh009 Wrote: Sorry, I meant that restriping at the time of repaving is better than restriping later. Didn't mean to imply that it's as good as properly separated bicycle lanes. Sorry, not sure what you mean by segregated, my point is that even if the road isn't being repaved, it should still be restriped as needed, I entirely agree that a road should be striped correctly .... from the factory....so to speak. The other point I was making was that restriping can look better or worse depending on how well it is done, we've seen some particularly poor jobs. RE: General Road and Highway Discussion - Acitta - 05-11-2020 RE: General Road and Highway Discussion - panamaniac - 05-11-2020 I want to say that the Stirling St extension/bridge was built in the mid-1960s. Am I in the ballpark or is my memory failing me? RE: General Road and Highway Discussion - Bob_McBob - 05-11-2020 (05-11-2020, 05:15 PM)panamaniac Wrote: I want to say that the Stirling St extension/bridge was built in the mid-1960s. Am I in the ballpark or is my memory failing me? The bridge was built in 1967. This is 1963 aerial imagery with the eventual location marked. RE: General Road and Highway Discussion - danbrotherston - 05-11-2020 That's a great source image. I would have put a 60/70's timeframe on it purely from the design. It's interesting that the strip of land was left open and the road built later, do you have any idea why that was? RE: General Road and Highway Discussion - panamaniac - 05-11-2020 I don’t know whether it was a factor, but CHCI opened in 1968 and the Stirling bridge provided the access route for the areas “south” of the railway tracks. It may also have anticipated future expansions of Schneiders and the resulting traffic. By the way, before the extension was built, what is now Stirling “south” of Mill St was called Shoemaker (Ave iirc). Also btw, Stirling was spelled “Sterling” until 1942. No idea why it was changed. RE: General Road and Highway Discussion - tomh009 - 05-12-2020 OK, now where can I find these old aerial shots? RE: General Road and Highway Discussion - clasher - 05-12-2020 (05-12-2020, 01:46 PM)tomh009 Wrote: OK, now where can I find these old aerial shots? I think they are somewhere on UW servers, I can't remember where though. RE: General Road and Highway Discussion - KevinL - 05-12-2020 The bridge structure was thoroughly redone sometime in the last decade, if I recall. I guess they never got to the actual road either side of it, though. RE: General Road and Highway Discussion - kps - 05-12-2020 (05-12-2020, 01:46 PM)tomh009 Wrote: OK, now where can I find these old aerial shots? Here: https://lib.uwaterloo.ca/locations/umd/project/ And here is the tile containing Stirling: https://lib.uwaterloo.ca/locations/umd/project/IM5.html The 1930 one is mucked up, but the 1945 and 1955 images are clearer than the 1963 one. RE: General Road and Highway Discussion - panamaniac - 05-12-2020 Amazing to realize that, as late as the mid-1950s, Shoemaker Lake (Lakeside Park) was out at the farthest edge of town. Off topic, but those photos also show the strange, undeveloped section of land that is more or less bounded by Mill, Stirling, and the railway tracks. It has been reduced in size over the years, and the Schneiders parking lot/Joy townhouses took a good part of it in recent times, but there's still an undeveloped area in the middle, "south" of the Schneider lands and "west" of Shoemaker Creek. I've always wondered what the story was with that area and how it came to be that the city jumped over it when post-war development came along. RE: General Road and Highway Discussion - Bob_McBob - 05-20-2020 The 2019 WRPS annual report is now available. Speeding charges continue to plummet. I don't think they list hours of enforcement, but given the two officer per car policy with the lousy radio system, and the distinct lack of policing I've observed as a driver, I sincerely doubt it's because everyone has slowed down. https://www.wrps.on.ca/en/about-us/annual-reports.aspx https://kitchener.ctvnews.ca/an-inside-look-at-policing-in-waterloo-region-2019-annual-service-report-1.4947087 Speeding charges: 2015 - 13,509 2016 - 11,473 2017 - 11,714 2018 - 8,847 2019 - 7,250 RE: General Road and Highway Discussion - danbrotherston - 05-20-2020 (05-20-2020, 06:50 PM)Bob_McBob Wrote: The 2019 WRPS annual report is now available. Speeding charges continue to plummet. I don't think they list hours of enforcement, but given the two officer per car policy with the lousy radio system, and the distinct lack of policing I've observed as a driver, I sincerely doubt it's because everyone has slowed down. Wow, that is shocking. We should plot that against budget. This sounds like TPS all over again. What is going on with our roads. RE: General Road and Highway Discussion - Nextasy - 05-26-2020 Not sure if this was posted already, but Highland is finally getting a MUT on both sides to Ira Needles. Guess that hit-and-run death turned up the pressure. Happy to see it, but a sad state of affairs. |