Waterloo Region Connected
ION - Waterloo Region's Light Rail Transit - Printable Version

+- Waterloo Region Connected (https://www.waterlooregionconnected.com)
+-- Forum: Waterloo Region Works (https://www.waterlooregionconnected.com/forumdisplay.php?fid=14)
+--- Forum: Transportation and Infrastructure (https://www.waterlooregionconnected.com/forumdisplay.php?fid=25)
+--- Thread: ION - Waterloo Region's Light Rail Transit (/showthread.php?tid=14)

Pages: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353 354 355 356 357 358 359 360 361 362 363 364 365 366 367 368 369 370 371 372 373 374 375 376 377 378 379 380 381 382 383 384 385 386 387 388 389 390 391 392 393 394 395 396 397 398 399 400 401 402 403 404 405 406 407 408 409 410 411 412 413 414 415 416 417 418 419 420 421 422 423 424 425 426 427 428 429 430 431 432 433 434 435 436 437 438 439 440 441 442 443 444 445 446 447 448 449 450 451 452 453 454 455 456 457 458 459 460 461 462 463 464 465 466 467 468 469 470 471 472 473 474 475 476 477 478 479 480 481 482 483 484 485 486 487 488 489 490 491 492 493 494 495 496 497 498 499 500 501 502 503 504 505 506 507 508 509 510 511 512 513 514 515 516 517 518 519 520 521 522 523 524 525 526 527 528 529 530 531 532 533 534 535 536 537 538 539 540 541 542 543 544 545 546 547 548 549 550 551 552 553 554 555 556 557 558 559 560 561 562 563 564 565 566 567 568 569 570 571 572 573 574 575 576 577 578 579 580 581 582 583 584 585 586 587 588 589 590 591 592 593 594 595 596 597 598 599 600 601 602 603 604 605 606 607 608 609 610 611 612 613 614 615 616 617 618 619 620 621 622 623 624 625 626 627 628 629 630 631 632 633 634 635 636 637 638 639 640 641 642 643 644 645 646 647 648 649 650 651 652 653 654 655 656 657 658 659 660 661 662 663 664 665 666 667 668 669 670 671 672 673 674 675 676 677 678 679 680 681 682 683 684 685 686 687 688 689 690 691 692 693 694 695 696 697 698 699 700 701 702 703 704 705 706 707 708 709 710 711 712 713 714 715 716 717 718 719 720 721 722 723 724 725 726 727 728 729 730 731 732 733 734 735 736 737 738 739 740 741 742 743 744 745 746 747 748 749 750 751 752 753 754 755 756 757 758 759 760 761 762 763 764 765 766 767 768 769 770 771 772 773 774 775 776 777 778 779 780 781 782 783 784 785 786 787 788 789 790 791 792 793 794 795 796 797 798 799 800 801 802 803 804 805 806 807 808 809 810 811 812 813 814 815 816 817 818 819 820 821 822 823 824 825 826 827 828 829 830 831 832 833 834 835 836 837 838 839 840 841 842 843 844 845 846 847 848 849 850 851 852 853 854 855 856 857 858 859 860 861 862 863 864 865 866 867 868 869 870 871 872 873 874 875 876 877 878 879 880 881 882 883 884 885 886 887 888 889 890 891 892 893 894 895 896 897 898 899 900 901 902 903 904 905 906 907 908 909 910 911 912 913 914 915 916 917 918 919 920 921 922 923 924 925 926 927 928 929 930 931 932 933 934 935 936 937 938 939 940 941 942 943 944 945 946 947 948 949 950 951 952 953 954 955 956 957 958 959 960 961 962 963 964 965 966 967 968 969 970 971 972 973 974 975 976 977 978 979 980 981 982 983 984 985 986 987 988 989 990 991 992 993 994 995 996 997 998 999 1000 1001 1002 1003 1004 1005 1006 1007 1008 1009 1010 1011 1012 1013 1014 1015 1016 1017 1018 1019 1020 1021 1022 1023 1024 1025 1026 1027 1028 1029 1030 1031 1032 1033 1034 1035 1036 1037 1038 1039 1040 1041 1042 1043 1044 1045 1046 1047 1048 1049 1050 1051 1052 1053 1054 1055 1056 1057 1058 1059 1060 1061 1062 1063 1064 1065 1066 1067 1068 1069 1070 1071 1072 1073 1074 1075 1076 1077 1078 1079 1080 1081 1082 1083 1084 1085 1086 1087 1088 1089 1090 1091 1092 1093 1094 1095 1096 1097 1098 1099 1100 1101 1102 1103 1104 1105 1106 1107 1108 1109 1110 1111 1112 1113 1114 1115 1116 1117 1118 1119 1120 1121 1122 1123 1124 1125 1126 1127 1128 1129 1130 1131 1132 1133 1134 1135 1136 1137 1138 1139 1140 1141 1142 1143 1144 1145 1146 1147 1148 1149 1150 1151 1152 1153 1154 1155 1156 1157 1158 1159 1160 1161 1162 1163 1164 1165 1166


RE: ION - Waterloo Region's Light Rail Transit - ijmorlan - 04-04-2019

(04-03-2019, 10:55 PM)danbrotherston Wrote: The fact is, they should have a good idea how long these things will take, if they don't, they aren't managing the project well.  There can be unexpected obstacles and we'd like to hear about those things as well, but they should know what's left.  I believe we (and "we" may include council and maybe even Region staff) just aren't being told.

Well said. The cone of silence around this project is appropriate for special ops, not for a transit project.

Although understanding in full detail what is going on requires a high level of interest, I think many people in town would like to have some information about what is going on. Imagine if they just tweeted stuff like this:

“Today we are testing the Cameron crossover after the repairs to the signalling system completed yesterday”

“No testing south of Mill today because crews are replacing the control units in the crossing control at Hayward”

“501 is still not in service due to work to replace the wiring harness”

(just examples made up, in case anybody thinks I have an inside track!)


RE: ION - Waterloo Region's Light Rail Transit - urbd - 04-04-2019

This will be an unpopular opinion but as long as the system is safe then it should be open, and just looking at the LRVs going up and down the whole line without any visible or serious issues make it seem that it could be safe enough to operate. Yes, I am aware of the legality and the processes and checklists, I am just speaking hypothetically. A system like this in Mexico or Colombia or elsewhere would be open and running right now and just fixed/finished along the way, but Canada has an extremely strict process. Systems that are this complex have perpetual construction and maintenance associated with them, so I would be fine with it opening even if it's not 100% perfect.


RE: ION - Waterloo Region's Light Rail Transit - danbrotherston - 04-04-2019

(04-04-2019, 02:40 PM)urbd Wrote: This will be an unpopular opinion but as long as the system is safe then it should be open, and just looking at the LRVs going up and down the whole line without any visible or serious issues make it seem that it could be safe enough to operate. Yes, I am aware of the legality and the processes and checklists, I am just speaking hypothetically. A system like this in Mexico or Colombia or elsewhere would be open and running right now and just fixed/finished along the way, but Canada has an extremely strict process. Systems that are this complex have perpetual construction and maintenance associated with them, so I would be fine with it opening even if it's not 100% perfect.

What level of service do you recommend opening at?

AFAIK the signals are not yet operating, so they can only run, 3 (or maybe 6) cars safely...meaning service is 30 minute at best.  Currently the iXpress provides better service.  There would be a huge service cut to start running.  More, starting revenue service will interfere with testing (seems like they test one section carefully, before moving on, on revenue service the cars have to run the whole route), so that could actually delay full service even longer.

The last part is the biggest problem, AFAIK neither the region, nor Grandlinq actually own any LRVs right now, since the signoff from Bombardier hasn't happened yet, Bombardier owns them, yes they *could* wave the signoff requirements--that wouldn't be wise. This is an artifact of how the contract is structured, but I think even in Mexico or Columbia, a government would have signoff requirements that need to be met. Part of the disconnect is that the route has been largely ready for some time and we are waiting on vehicles to be ready.

In some cases I might agree, but in this case, we currently have iXpress 200 operating the route, and the costs would be so high I don't think it makes any sense.


RE: ION - Waterloo Region's Light Rail Transit - plam - 04-04-2019

I heard a platform announcement today at the University of Waterloo station. Couldn't quite tell what it was saying.


RE: ION - Waterloo Region's Light Rail Transit - urbd - 04-04-2019

(04-04-2019, 02:50 PM)danbrotherston Wrote:
(04-04-2019, 02:40 PM)urbd Wrote: This will be an unpopular opinion but as long as the system is safe then it should be open, and just looking at the LRVs going up and down the whole line without any visible or serious issues make it seem that it could be safe enough to operate. Yes, I am aware of the legality and the processes and checklists, I am just speaking hypothetically. A system like this in Mexico or Colombia or elsewhere would be open and running right now and just fixed/finished along the way, but Canada has an extremely strict process. Systems that are this complex have perpetual construction and maintenance associated with them, so I would be fine with it opening even if it's not 100% perfect.

What level of service do you recommend opening at?

AFAIK the signals are not yet operating, so they can only run, 3 (or maybe 6) cars safely...meaning service is 30 minute at best.  Currently the iXpress provides better service.  There would be a huge service cut to start running.  More, starting revenue service will interfere with testing (seems like they test one section carefully, before moving on, on revenue service the cars have to run the whole route), so that could actually delay full service even longer.

The last part is the biggest problem, AFAIK neither the region, nor Grandlinq actually own any LRVs right now, since the signoff from Bombardier hasn't happened yet, Bombardier owns them, yes they *could* wave the signoff requirements--that wouldn't be wise. This is an artifact of how the contract is structured, but I think even in Mexico or Columbia, a government would have signoff requirements that need to be met. Part of the disconnect is that the route has been largely ready for some time and we are waiting on vehicles to be ready.

In some cases I might agree, but in this case, we currently have iXpress 200 operating the route, and the costs would be so high I don't think it makes any sense.

I would be totally fine with 30 min, even 45 min service to start WITH the 200 iXpress still running every 15 min or so (with adjusted route, to fill the middle of the ION 30 min wait).

As for the second part, I am aware of this and yes it's exactly part of the legality/process/bureaucracy I was referring to. What I meant by using Mexico and Colombia as examples is that the legal lines in those places are blurred and adjusted as necessary for political reasons. For example, if this was being built in Mexico and the trains were already 80% tested, the track 100% done, stations 100% done, and the ownership of the trains was not fully transferred legally, I am sure that local Mexican government would simply launch the system (pay a couple officials for X and Y companies to sign some sort of fake agreement while the 'legal' process is being done) even if it's not fully legal/tested/etc. Just putting things into perspective... of course I'd like a fully reliable system but I do feel we are over-cautious here sometimes.


RE: ION - Waterloo Region's Light Rail Transit - danbrotherston - 04-04-2019

(04-04-2019, 03:28 PM)urbd Wrote:
(04-04-2019, 02:50 PM)danbrotherston Wrote: What level of service do you recommend opening at?

AFAIK the signals are not yet operating, so they can only run, 3 (or maybe 6) cars safely...meaning service is 30 minute at best.  Currently the iXpress provides better service.  There would be a huge service cut to start running.  More, starting revenue service will interfere with testing (seems like they test one section carefully, before moving on, on revenue service the cars have to run the whole route), so that could actually delay full service even longer.

The last part is the biggest problem, AFAIK neither the region, nor Grandlinq actually own any LRVs right now, since the signoff from Bombardier hasn't happened yet, Bombardier owns them, yes they *could* wave the signoff requirements--that wouldn't be wise. This is an artifact of how the contract is structured, but I think even in Mexico or Columbia, a government would have signoff requirements that need to be met. Part of the disconnect is that the route has been largely ready for some time and we are waiting on vehicles to be ready.

In some cases I might agree, but in this case, we currently have iXpress 200 operating the route, and the costs would be so high I don't think it makes any sense.

I would be totally fine with 30 min, even 45 min service to start WITH the 200 iXpress still running every 15 min or so (with adjusted route, to fill the middle of the ION 30 min wait).

As for the second part, I am aware of this and yes it's exactly part of the legality/process/bureaucracy I was referring to. What I meant by using Mexico and Colombia as examples is that the legal lines in those places are blurred and adjusted as necessary for political reasons. For example, if this was being built in Mexico and the trains were already 80% tested, the track 100% done, stations 100% done, and the ownership of the trains was not fully transferred legally, I am sure that local Mexican government would simply launch the system (pay a couple officials for X and Y companies to sign some sort of fake agreement while the 'legal' process is being done) even if it's not fully legal/tested/etc. Just putting things into perspective... of course I'd like a fully reliable system but I do feel we are over-cautious here sometimes.

Well that's terrible, IMO, now I have to guess whether to go to the iXpress stop or the LRT stop...

I really don't believe ownership of million dollar property is so flexible in South America, but I must admit, I really don't know.

I agree we are overcautious sometimes, but I don't necessarily believe this is one of those times.


RE: ION - Waterloo Region's Light Rail Transit - neonjoe - 04-04-2019

Why not run the 301R buses in parallel...


RE: ION - Waterloo Region's Light Rail Transit - KevinT - 04-04-2019

(04-04-2019, 02:40 PM)urbd Wrote: This will be an unpopular opinion but as long as the system is safe then it should be open, and just looking at the LRVs going up and down the whole line without any visible or serious issues make it seem that it could be safe enough to operate. Yes, I am aware of the legality and the processes and checklists, I am just speaking hypothetically.

Back in 1930 you could operate a system the moment the trains could run on the tracks. Of course back in 1930 people died on the job all the time and nobody other than their immediate friends and family cared. These days the system has to be able to operate safely and reliably, not just so that no one dies on the job but so that even the lowliest of innocent bystanders is not put at risk.

In 1930 a vehicle needed a working throttle, brakes, and little else. The driver's control authority was absolute and if he effed up or a single thing broke, you could die.

These days there's crossing signals, traffic signals, route coordination, collision prevention, limits enforcement, emergency brakes, automatic emergency brakes, holding brakes, cameras, e-stops, e-stop strips, heaters, air conditioners, lights, emergency lights, windshield wipers, horns, gongs, sanders, headlights, brake lights, turn signals, window defrosters, and a whole ton of other things I've overlooked. I want ALL of these things to be working properly because my safety is NOT an option. (Yes, you can be injured by malfunctioning HVAC equipment.) These aren't just check list items, these are real things that have to work because when they don't people get hurt. You can't look at it and say "Yep, that appears to work, ship it." because safety MUST be tested and proven. When it's not, well, there's that whole people getting hurt thing again. The rules may seem arbitrary, but when you look back I'm certain each of them was a direct result of somebody getting seriously hurt.

Of course you also can't forget about the destination boards, stop annunciators, PA systems, door openers/closers, door open/close buttons, and stop request buttons. These things are also important to the proper operation of the system. This should all be working before the system opens, and if I have to wait an extra few months for it then so be it. Just keep me informed so I know a little bit about why I'm waiting, and how long you think it's going to take.


RE: ION - Waterloo Region's Light Rail Transit - urbd - 04-04-2019

(04-04-2019, 03:33 PM)neonjoe Wrote: Why not run the 301R buses in parallel...

Exactly...


RE: ION - Waterloo Region's Light Rail Transit - jason897 - 04-04-2019

(04-04-2019, 03:15 PM)plam Wrote: I heard a platform announcement today at the University of Waterloo station. Couldn't quite tell what it was saying.

I heard an announcement at Victoria Park this afternoon something along the lines of "system testing is in progress... there is no passenger train service from this station at this time"


RE: ION - Waterloo Region's Light Rail Transit - plam - 04-05-2019

(04-04-2019, 10:44 PM)jason897 Wrote:
(04-04-2019, 03:15 PM)plam Wrote: I heard a platform announcement today at the University of Waterloo station. Couldn't quite tell what it was saying.

I heard an announcement at Victoria Park this afternoon something along the lines of "system testing is in progress... there is no passenger train service from this station at this time"

Yep, that was similar to what I heard.


RE: ION - Waterloo Region's Light Rail Transit - kitborn - 04-05-2019

Kitchener Transit drivers are about to do their sign-up for the next spring period. I have been informed that they are signing routes that are currently in effect, meaning that the ION will not start until the next sign-up period (summer). However, it is possible to do a mini sign-up if the ION is completed.


RE: ION - Waterloo Region's Light Rail Transit - jeffster - 04-06-2019

(04-05-2019, 10:08 AM)kitborn Wrote: Kitchener Transit drivers are about to do their sign-up for the next spring period. I have been informed that they are signing routes that are currently in effect, meaning that the ION will not start until the next sign-up period (summer). However, it is possible to do a mini sign-up if the ION is completed.

I have a couple friends that work at GRT and both said something similar -- and they're thinking that LRT is likely summer 2020 at the earliest, or spring 2022 at the latest. Apparently 'not even remotely complete' but I have no idea what that means.


RE: ION - Waterloo Region's Light Rail Transit - Square - 04-06-2019

(04-06-2019, 01:07 AM)jeffster Wrote:
(04-05-2019, 10:08 AM)kitborn Wrote: Kitchener Transit drivers are about to do their sign-up for the next spring period. I have been informed that they are signing routes that are currently in effect, meaning that the ION will not start until the next sign-up period (summer). However, it is possible to do a mini sign-up if the ION is completed.

I have a couple friends that work at GRT and both said something similar -- and they're thinking that LRT is likely summer 2020 at the earliest, or spring 2022 at the latest. Apparently 'not even remotely complete' but I have no idea what that means.

Lol, why not 2030, when we get full GO trains and the High Speed trains!  Smile


RE: ION - Waterloo Region's Light Rail Transit - trainspotter139 - 04-06-2019

(04-06-2019, 01:07 AM)jeffster Wrote:
(04-05-2019, 10:08 AM)kitborn Wrote: Kitchener Transit drivers are about to do their sign-up for the next spring period. I have been informed that they are signing routes that are currently in effect, meaning that the ION will not start until the next sign-up period (summer). However, it is possible to do a mini sign-up if the ION is completed.

I have a couple friends that work at GRT and both said something similar -- and they're thinking that LRT is likely summer 2020 at the earliest, or spring 2022 at the latest. Apparently 'not even remotely complete' but I have no idea what that means.

'Not even remotely complete' in this industry can be the difference of missing a single piece of paperwork.