Waterloo Region Connected
ION - Waterloo Region's Light Rail Transit - Printable Version

+- Waterloo Region Connected (https://www.waterlooregionconnected.com)
+-- Forum: Waterloo Region Works (https://www.waterlooregionconnected.com/forumdisplay.php?fid=14)
+--- Forum: Transportation and Infrastructure (https://www.waterlooregionconnected.com/forumdisplay.php?fid=25)
+--- Thread: ION - Waterloo Region's Light Rail Transit (/showthread.php?tid=14)

Pages: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353 354 355 356 357 358 359 360 361 362 363 364 365 366 367 368 369 370 371 372 373 374 375 376 377 378 379 380 381 382 383 384 385 386 387 388 389 390 391 392 393 394 395 396 397 398 399 400 401 402 403 404 405 406 407 408 409 410 411 412 413 414 415 416 417 418 419 420 421 422 423 424 425 426 427 428 429 430 431 432 433 434 435 436 437 438 439 440 441 442 443 444 445 446 447 448 449 450 451 452 453 454 455 456 457 458 459 460 461 462 463 464 465 466 467 468 469 470 471 472 473 474 475 476 477 478 479 480 481 482 483 484 485 486 487 488 489 490 491 492 493 494 495 496 497 498 499 500 501 502 503 504 505 506 507 508 509 510 511 512 513 514 515 516 517 518 519 520 521 522 523 524 525 526 527 528 529 530 531 532 533 534 535 536 537 538 539 540 541 542 543 544 545 546 547 548 549 550 551 552 553 554 555 556 557 558 559 560 561 562 563 564 565 566 567 568 569 570 571 572 573 574 575 576 577 578 579 580 581 582 583 584 585 586 587 588 589 590 591 592 593 594 595 596 597 598 599 600 601 602 603 604 605 606 607 608 609 610 611 612 613 614 615 616 617 618 619 620 621 622 623 624 625 626 627 628 629 630 631 632 633 634 635 636 637 638 639 640 641 642 643 644 645 646 647 648 649 650 651 652 653 654 655 656 657 658 659 660 661 662 663 664 665 666 667 668 669 670 671 672 673 674 675 676 677 678 679 680 681 682 683 684 685 686 687 688 689 690 691 692 693 694 695 696 697 698 699 700 701 702 703 704 705 706 707 708 709 710 711 712 713 714 715 716 717 718 719 720 721 722 723 724 725 726 727 728 729 730 731 732 733 734 735 736 737 738 739 740 741 742 743 744 745 746 747 748 749 750 751 752 753 754 755 756 757 758 759 760 761 762 763 764 765 766 767 768 769 770 771 772 773 774 775 776 777 778 779 780 781 782 783 784 785 786 787 788 789 790 791 792 793 794 795 796 797 798 799 800 801 802 803 804 805 806 807 808 809 810 811 812 813 814 815 816 817 818 819 820 821 822 823 824 825 826 827 828 829 830 831 832 833 834 835 836 837 838 839 840 841 842 843 844 845 846 847 848 849 850 851 852 853 854 855 856 857 858 859 860 861 862 863 864 865 866 867 868 869 870 871 872 873 874 875 876 877 878 879 880 881 882 883 884 885 886 887 888 889 890 891 892 893 894 895 896 897 898 899 900 901 902 903 904 905 906 907 908 909 910 911 912 913 914 915 916 917 918 919 920 921 922 923 924 925 926 927 928 929 930 931 932 933 934 935 936 937 938 939 940 941 942 943 944 945 946 947 948 949 950 951 952 953 954 955 956 957 958 959 960 961 962 963 964 965 966 967 968 969 970 971 972 973 974 975 976 977 978 979 980 981 982 983 984 985 986 987 988 989 990 991 992 993 994 995 996 997 998 999 1000 1001 1002 1003 1004 1005 1006 1007 1008 1009 1010 1011 1012 1013 1014 1015 1016 1017 1018 1019 1020 1021 1022 1023 1024 1025 1026 1027 1028 1029 1030 1031 1032 1033 1034 1035 1036 1037 1038 1039 1040 1041 1042 1043 1044 1045 1046 1047 1048 1049 1050 1051 1052 1053 1054 1055 1056 1057 1058 1059 1060 1061 1062 1063 1064 1065 1066 1067 1068 1069 1070 1071 1072 1073 1074 1075 1076 1077 1078 1079 1080 1081 1082 1083 1084 1085 1086 1087 1088 1089 1090 1091 1092 1093 1094 1095 1096 1097 1098 1099 1100 1101 1102 1103 1104 1105 1106 1107 1108 1109 1110 1111 1112 1113 1114 1115 1116 1117 1118 1119 1120 1121 1122 1123 1124 1125 1126 1127 1128 1129 1130 1131 1132 1133 1134 1135 1136 1137 1138 1139 1140 1141 1142 1143 1144 1145 1146 1147 1148 1149 1150 1151 1152 1153 1154 1155 1156 1157 1158 1159 1160 1161 1162 1163 1164 1165 1166


RE: ION - Waterloo Region's Light Rail Transit - ijmorlan - 10-05-2016

(10-05-2016, 11:59 AM)Markster Wrote:
(10-05-2016, 11:47 AM)Canard Wrote: When doing this same left turn previously, I always questioned if I was allowed to turn Left on a Red, here, because it's One-way to One-way.  I vaguely remember this in driver's school as being "OK" but I hate doing it so I would never do it, and just wait for green.  The only times I've ever done it is when someone's behind me and I can see in my rear-view mirror that they're annoyed because I'm not turning, and then I'd very reluctantly do it.

It is absolutely legal!
I find excuses to do it whenever I can!  It's fun doing something out of the ordinary.
Also.... I may be that impatient person behind you.  Though, I try to keep my frustration contained inside, and not be a jerk.

The bike box being so far set back from the intersection seems to basically invite cars to drive through it and wait on the far side to try to make their left turn on red.

Quote:On a side note, as a cyclist, I would never feel comfortable using a Bike Box.  I'll always wait my turn in traffic.

Honestly, that bike box there feels particularly useless.  It is only useful for turning left from Caroline to Erb, but... where are these cyclists coming from that they would want to do that turn?  
*) If you're coming from the Laurel Trail, then the intersection already assumes you don't exist, as there is no sane(/legal) way to get to the bike box.
*) If you're coming down Caroline, then... you just came from Bridgeport? Why are you turning around? Shouldn't you be taking a different route to your destination?  
*) Did you come from Albert? There are less terrifying and hilly ways to get to King/Erb than going via Caroline.

Also, bikes don’t legally have to wait to turn left any more than cars do. They should be advancing far enough they can see traffic on Erb, and make the left as soon as it is safe to do so, regardless of the state of the traffic signal.

I will say I have occasionally been annoyed by somebody not realizing they should be attempting to make their turn. I think the issue is that we have very few left-turn-on-red locations in this city. In fact, I can’t think of any others. A place like Calgary is much different — their downtown is full of them.


RE: ION - Waterloo Region's Light Rail Transit - KevinL - 10-05-2016

Another elevated intersection shot from the Ion team...

[Image: 14543657_10154602986282959_6410092675272411074_o.jpg]


RE: ION - Waterloo Region's Light Rail Transit - panamaniac - 10-05-2016

That U-Haul has GOT to go! ;
0


RE: ION - Waterloo Region's Light Rail Transit - danbrotherston - 10-05-2016

(10-05-2016, 11:43 AM)Markster Wrote:
(10-04-2016, 10:56 PM)danbrotherston Wrote: WRT to the left turn at the bike box.  The region has indicated that right turns on red at bike boxes are prohibited, I would assume left turns on red are similarly prohibited.  Of course, given that this is not marked anywhere, nobody really knows, and everyone turns anyway.

As both a cyclist and a driver, I had no idea that this is a thing they claim.
Ultimately, if they don't have "no right(/left) on red" signs, then it's just talk, and no action.

I definitely agree, it's another pointless bylaw.  I doubt the police will even know to enforce it.  This was mentioned on one tour at some point, by someone from CoK.

This bike box however, we all know is stupid, it exists because when the intersection design was done...what, 10 years ago or more now, the city/region had a completely different idea of bike infra from what they do now.  Of course, now has its problems too, like, lack of safe and legal crossings.  Frankly, as a cyclist, I've given up following the law, I do what's right, and if the police want to ticket me, I'm happy to have a day in court.

WRT to bike boxes in general though, I like them, they're very useful where a bike lane ends, because they give me an obvious moment to merge into traffic instead of risking getting squeezed out at the intersection.  And obviously, they're important for left turns.  Frankly, I do left turns in the "bike box" way most of the time anyway (at least when I'm approaching a red), but it does occasionally freak out drivers making the left in the other direction who think I might continue all the way through the intersection. It's far less uncomfortable than merging through 2-4 lanes of speeding traffic.


RE: ION - Waterloo Region's Light Rail Transit - timc - 10-05-2016

(10-05-2016, 02:03 PM)danbrotherston Wrote: WRT to bike boxes in general though, I like them, they're very useful where a bike lane ends

It would be really nice if we could have them for those cases. I go through a few such intersections regularly. University at Weber, University at King, Columbia at King, and Columbia at Fischer-Hallman come to mind. I could see bike boxes being useful in those places.


RE: ION - Waterloo Region's Light Rail Transit - Lens - 10-05-2016

(10-05-2016, 01:01 PM)KevinL Wrote: Another elevated intersection shot from the Ion team...

[Image: 14543657_10154602986282959_6410092675272411074_o.jpg]

That walk sign on the island definitely looks to be in the way for anyone crossing from One Vic to the Pharmacy to the Hub or vice versa. From that shot it looks like anyone with a mobility device will have to cross the tracks instead of using the island.


RE: ION - Waterloo Region's Light Rail Transit - jwilliamson - 10-05-2016

The first layer of rebar is down in Uptown


RE: ION - Waterloo Region's Light Rail Transit - Smore - 10-05-2016

the bus only lane and right of the island sign at King ("NB") and Vic have been fixed...now no bus only sign and a left of the island. No chevrons.


RE: ION - Waterloo Region's Light Rail Transit - Canard - 10-05-2016

I have confirmation from Grandlinq that the final design of the signs here will be replaced replaced with the one in my avatar, the new Ontario standard for all LRT lines pictogram.

Edit - That's great news, jwilliamson!


RE: ION - Waterloo Region's Light Rail Transit - Canard - 10-06-2016

Well this is great news!

New option may see LRT in service as scheduled in late 2017

I'm excited but I don't like that our opening ceremony will then get pushed close to winter. If it's like the weather is right now, I'm fine with that. But if it slipped at all, and went into November/December, then I'd rather just wait for a Spring 2018 opening.

No opening ceremony in the snow!!


RE: ION - Waterloo Region's Light Rail Transit - dunkalunk - 10-06-2016

(10-06-2016, 08:29 AM)Canard Wrote: Well this is great news!

New option may see LRT in service as scheduled in late 2017

I'm excited but I don't like that our opening ceremony will then get pushed close to winter. If it's like the weather is right now, I'm fine with that. But if it slipped at all, and went into November/December, then I'd rather just wait for a Spring 2018 opening.

No opening ceremony in the snow!!


There are definitely advantages to beginning ION service sooner, but if it is to begin sooner it is very important that it is as frequent as 200 iXpress is now. As I see it, we could feasibly begin service with 12 out of 14 vehicles (the number required for 10 minute headways with 2 spares). I would consider 10 minutes the maximum headway acceptable for launch of ION service. Anything greater would mean a reduction in service from the existing 200 iXpress. While it would be great to have 8 minute frequency from launch, I think the trade-offs of beginning ION service sooner would be worth it.

With this in mind, I would hope for a launch to coincide with the Holiday 2017 schedule service period. Hopefully, this delay will allow Bombardier enough leeway to have delivered enough trains to make 10 minute service feasible. While a winter launch may not be the most ideal photo op, beginning ION service at this time will allow two weeks buffer to run ION at further reduced frequency if absolutely necessary. It will also allow transit users and bus drivers the chance to get used to the new transit network before regular service resumes in January. 

The first benefit in my mind to an earlier ION launch would be implementation of GRT route streamlining around ION stations. There is a lot the restructuring will do to improve both the directness and frequency of trips on GRT whether or not those trips involve making a connection with ION. For instance, the realigning of routes in SW Kitchener to Block Line station and away from Forest Glen will significantly improve the efficiency of bus routes and reduce the amount of time riders spend on-route and making connections between routes. 

Until 8 minute peak frequency on ION can be realised, it would be good to see additional (unscheduled) runs added to routes in the CTC during peak periods. If there are spare buses available (by extending service life of soon-to-be-retired vehicles or otherwise), Route 7 King and Route 8 Courtland in the 2018 GRT service proposal would benefit from additional runs.

It may also be prudent to investigate the possibility of operating with 11 vehicles instead of 12 in case Bombardier's schedule slips. To ensure frequency does not fall below 10 minutes, we should look at operating with one spare instead of two. It may not be desirable to operate the system with only one spare, however if it is possible in the terms negotiated with Grandlinq, it is in my mind a risk worth taking, especially if the 12th vehicle is in the process on burn-in at the time of ION launch.

Ultimately, I don't want to see frequency sacrificed for the sake of a snow-free opening ceremony. What matters more is the service. 15 minute frequency on ION at launch would potentially damage existing transit ridership in the central transit corridor due to the existing 10 minute service on route 200.


RE: ION - Waterloo Region's Light Rail Transit - timc - 10-06-2016

I still have a hard time believing that Bombardier will be able to deliver on their re-re-rescheduled timeline. But other than that, I don't care whether the weather is nice when service begins.


RE: ION - Waterloo Region's Light Rail Transit - Markster - 10-06-2016

(10-06-2016, 10:42 AM)dunkalunk Wrote: Ultimately, I don't want to see frequency sacrificed for the sake of a snow-free opening ceremony. What matters more is the service. 15 minute frequency on ION at launch would potentially damage existing transit ridership in the central transit corridor due to the existing 10 minute service on route 200.

If 15 minute frequency means we launch in September, I'm fine with that.
Keep in mind that GRT has no qualms with running 15 minute 200 frequency all summer long. Just instead of the 2017 September boost being a frequency boost, we get a vehicle/priority boost.


RE: ION - Waterloo Region's Light Rail Transit - urbd - 10-06-2016

I want ION to be open and running as soon as possible even at 15-18 min peak intervals... There probably will be a special 200 still in operation at the same time as ION starts to fill the gaps, and as long as it is very clear that it's a transition phase for a few months it shouldn't be a big deal. Bus riders are already used to so much change that i'm sure this wouldn't affect ridership.

Also, I could not care less if the opening ceremony is December 31st at midnight with 2 feet of snow. We need this service, asap.


RE: ION - Waterloo Region's Light Rail Transit - Canard - 10-06-2016

15 minute with reduced trains is optimistic. I'm expecting closer to 30 minute headways with anything less than the full compliment.

I have the day off so was (finally!) able to see some mid-day action instead of just barren construction sites after-hours.

Some guys working on the Cameron crossover this morning but nowhere near a concrete pour. Still missing welds. No forms or anything here either so that is not something happening in the next few days.

Unfortunately the Allen and Northfield platforms are both having their edges demolished for the grounding rework. The good thing is that Northfield has its station structure up.

Anchor wall hardware is sitting on-site at Cedar/Kitchener Market.

The real action is at Conestoga - I bet there are 100 people on site. I've never seen so much activity before! A big pour is happening there.

Northfield is looking great and getting cleaned up.

On King, between Union and Wellington, they have finally removed almost all of the orange barrels. Believe it or not but this is the step that really makes a section look "finished". As a cyclist, I hugely appreciate this, too, because those barrels ate up a good metre of rideable space in what is already a narrow corridor.

I can't believe it's almost done. Too fast!!