Waterloo Region Connected
ION - Waterloo Region's Light Rail Transit - Printable Version

+- Waterloo Region Connected (https://www.waterlooregionconnected.com)
+-- Forum: Waterloo Region Works (https://www.waterlooregionconnected.com/forumdisplay.php?fid=14)
+--- Forum: Transportation and Infrastructure (https://www.waterlooregionconnected.com/forumdisplay.php?fid=25)
+--- Thread: ION - Waterloo Region's Light Rail Transit (/showthread.php?tid=14)

Pages: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353 354 355 356 357 358 359 360 361 362 363 364 365 366 367 368 369 370 371 372 373 374 375 376 377 378 379 380 381 382 383 384 385 386 387 388 389 390 391 392 393 394 395 396 397 398 399 400 401 402 403 404 405 406 407 408 409 410 411 412 413 414 415 416 417 418 419 420 421 422 423 424 425 426 427 428 429 430 431 432 433 434 435 436 437 438 439 440 441 442 443 444 445 446 447 448 449 450 451 452 453 454 455 456 457 458 459 460 461 462 463 464 465 466 467 468 469 470 471 472 473 474 475 476 477 478 479 480 481 482 483 484 485 486 487 488 489 490 491 492 493 494 495 496 497 498 499 500 501 502 503 504 505 506 507 508 509 510 511 512 513 514 515 516 517 518 519 520 521 522 523 524 525 526 527 528 529 530 531 532 533 534 535 536 537 538 539 540 541 542 543 544 545 546 547 548 549 550 551 552 553 554 555 556 557 558 559 560 561 562 563 564 565 566 567 568 569 570 571 572 573 574 575 576 577 578 579 580 581 582 583 584 585 586 587 588 589 590 591 592 593 594 595 596 597 598 599 600 601 602 603 604 605 606 607 608 609 610 611 612 613 614 615 616 617 618 619 620 621 622 623 624 625 626 627 628 629 630 631 632 633 634 635 636 637 638 639 640 641 642 643 644 645 646 647 648 649 650 651 652 653 654 655 656 657 658 659 660 661 662 663 664 665 666 667 668 669 670 671 672 673 674 675 676 677 678 679 680 681 682 683 684 685 686 687 688 689 690 691 692 693 694 695 696 697 698 699 700 701 702 703 704 705 706 707 708 709 710 711 712 713 714 715 716 717 718 719 720 721 722 723 724 725 726 727 728 729 730 731 732 733 734 735 736 737 738 739 740 741 742 743 744 745 746 747 748 749 750 751 752 753 754 755 756 757 758 759 760 761 762 763 764 765 766 767 768 769 770 771 772 773 774 775 776 777 778 779 780 781 782 783 784 785 786 787 788 789 790 791 792 793 794 795 796 797 798 799 800 801 802 803 804 805 806 807 808 809 810 811 812 813 814 815 816 817 818 819 820 821 822 823 824 825 826 827 828 829 830 831 832 833 834 835 836 837 838 839 840 841 842 843 844 845 846 847 848 849 850 851 852 853 854 855 856 857 858 859 860 861 862 863 864 865 866 867 868 869 870 871 872 873 874 875 876 877 878 879 880 881 882 883 884 885 886 887 888 889 890 891 892 893 894 895 896 897 898 899 900 901 902 903 904 905 906 907 908 909 910 911 912 913 914 915 916 917 918 919 920 921 922 923 924 925 926 927 928 929 930 931 932 933 934 935 936 937 938 939 940 941 942 943 944 945 946 947 948 949 950 951 952 953 954 955 956 957 958 959 960 961 962 963 964 965 966 967 968 969 970 971 972 973 974 975 976 977 978 979 980 981 982 983 984 985 986 987 988 989 990 991 992 993 994 995 996 997 998 999 1000 1001 1002 1003 1004 1005 1006 1007 1008 1009 1010 1011 1012 1013 1014 1015 1016 1017 1018 1019 1020 1021 1022 1023 1024 1025 1026 1027 1028 1029 1030 1031 1032 1033 1034 1035 1036 1037 1038 1039 1040 1041 1042 1043 1044 1045 1046 1047 1048 1049 1050 1051 1052 1053 1054 1055 1056 1057 1058 1059 1060 1061 1062 1063 1064 1065 1066 1067 1068 1069 1070 1071 1072 1073 1074 1075 1076 1077 1078 1079 1080 1081 1082 1083 1084 1085 1086 1087 1088 1089 1090 1091 1092 1093 1094 1095 1096 1097 1098 1099 1100 1101 1102 1103 1104 1105 1106 1107 1108 1109 1110 1111 1112 1113 1114 1115 1116 1117 1118 1119 1120 1121 1122 1123 1124 1125 1126 1127 1128 1129 1130 1131 1132 1133 1134 1135 1136 1137 1138 1139 1140 1141 1142 1143 1144 1145 1146 1147 1148 1149 1150 1151 1152 1153 1154 1155 1156 1157 1158 1159 1160 1161 1162 1163 1164 1165 1166


RE: ION - Waterloo Region's Light Rail Transit - jamincan - 01-18-2022

I'm not sure why, but you're really prone to misrepresenting facts related to ION. It opened about 1.5 years, which isn't great, but isn't that unusual for major infrastructure projects. The trains weren't about to fall apart - there were welding issues but not severe enough that the trains couldn't be used in service. They remained in service and a 15th unit that Bombardier provided as compensation to the region for they delays filled in as they were taken out of service individually (I'm actually not sure if the work is complete yet).

The slightly raised platforms are to allow level boarding so that the trains are accessible. I don't believe any other vehicle was really in the cards anyway, as we were piggybacking on the Metrolinx order for the Eglinton LRT in Toronto. Even if high-floor vehicles were an option, I strongly disagree that they would have been a good one - look at how disruptive they are to the streetscape in downtown Calgary, for example.


RE: ION - Waterloo Region's Light Rail Transit - ijmorlan - 01-18-2022

(01-18-2022, 05:06 PM)ac3r Wrote:
(01-18-2022, 02:41 PM)Bytor Wrote: Also, how were the City snow plows allowed to just plow the snow over the LRT tracks

Well...where are they supposed to put the snow? Snow plows - at least the ones we/most cities have - have angled blades that push it to the right side. Some sections of the track do run on the right side of where vehicles drive. Unless we bought a fleet of plows that have snow blowers that can blow it into a dump truck (which is extremely inefficient), they have to push the snow somewhere. Example, places like this or this. The normal snowplows don't or can't plow this since there is a curb and because the plow can damage the track, so there will be challenges.

When they designed and engineered this thing, they tried to put the tracks in the middle as much as they could for these sort of issues, but there are still sections it was not possible. And, since we live in a climate where we get tons of snow (sometimes, anyway), there will be challenges with snow removal. TBH, the system here runs okay. Comparably, I've spent a lot of time in Russia where they have heavy snowfall and streetcars/trams just like ours (sure it's "rapid transit" LRT and grade separated but still suffers from the same problems with climate and is as slow as a streetcar) and over there you still face days where the snow buggers things up. It's a pretty normal thing, though over here you'd think we would invest in better clearing measures given that we're economically superior.

Planning for snow, and snow removal, should have been part of the system design.

I don’t understand your statement about sections where putting the tracks in the middle was not possible. The rule for on-street trackage is single track at the side, double track in the middle, except for the 2 blocks on Benton/Frederick where a single track is in the middle. The question is why. I don’t believe I’ve ever seen an attempt at an explanation. How was it “not possible” for the single track on King, for example, from Allen to the public square to be put in the middle?


RE: ION - Waterloo Region's Light Rail Transit - ijmorlan - 01-18-2022

(01-18-2022, 06:00 PM)jamincan Wrote: Even if high-floor vehicles were an option, I strongly disagree that they would have been a good one - look at how disruptive they are to the streetscape in downtown Calgary, for example.

You would need significantly bigger (longer) ramps, and locations where the platform is effectively part of the sidewalk would need to be significantly redesigned. So I agree that even though the LRT stops only at specific locations, we get significant flexibility in station design from the low floor design.


RE: ION - Waterloo Region's Light Rail Transit - ac3r - 01-18-2022

(01-18-2022, 06:01 PM)ijmorlan Wrote: The rule for on-street trackage is single track at the side, double track in the middle, except for the 2 blocks on Benton/Frederick where a single track is in the middle. The question is why. I don’t believe I’ve ever seen an attempt at an explanation. How was it “not possible” for the single track on King, for example, from Allen to the public square to be put in the middle?

How can it be a rule be a rule...then not a rule? Lol. The design of this LRT was just a complete shit show. I guess it's better than nothing...but I've travelled to dozens of countries in my life, visited countless cities with transit systems and ours is easily somewhere near the bottom of the totem pole. I hope the second line in Cambridge isn't as bad, though I'm not crossing my fingers.


RE: ION - Waterloo Region's Light Rail Transit - tomh009 - 01-18-2022

(01-18-2022, 05:54 PM)taylortbb Wrote:
(01-18-2022, 05:46 PM)tomh009 Wrote: Are those coulombs you are using for current?

I believe Dan is referring to the C-rate, http://web.mit.edu/evt/summary_battery_specifications.pdf . It's a way of measuring discharge current that's normalized for battery capacity, a 1C discharge rate will fully discharge a battery in 1 hour. It basically measures how much stress a battery is under, as the safe discharge rate of a battery depends heavily on its capacity.

Ugh. Way to go whoever came up with this, using the symbol of a well-established SI unit to mean something completely different. 😥


RE: ION - Waterloo Region's Light Rail Transit - ijmorlan - 01-18-2022

(01-18-2022, 07:58 PM)ac3r Wrote:
(01-18-2022, 06:01 PM)ijmorlan Wrote: The rule for on-street trackage is single track at the side, double track in the middle, except for the 2 blocks on Benton/Frederick where a single track is in the middle. The question is why. I don’t believe I’ve ever seen an attempt at an explanation. How was it “not possible” for the single track on King, for example, from Allen to the public square to be put in the middle?

How can it be a rule be a rule...then not a rule? Lol. The design of this LRT was just a complete shit show. I guess it's better than nothing...but I've travelled to dozens of countries in my life, visited countless cities with transit systems and ours is easily somewhere near the bottom of the totem pole. I hope the second line in Cambridge isn't as bad, though I'm not crossing my fingers.

My point is, you said they put the tracks in the middle except where they can’t; but really they put the tracks in the middle precisely when there are two tracks together, on-street, with the one exception for those 2 short blocks. I haven’t seen any evidence that it has anything to do with what is “possible”.

(the other exception one might think of is the stop at King & Victoria, but there you see one track on each side of the street, continuing the rule that lone tracks are at the curb and a pair of tracks are in the middle)


RE: ION - Waterloo Region's Light Rail Transit - clasher - 01-18-2022

(01-18-2022, 03:48 PM)danbrotherston Wrote: Yeah, I've used a very similar unit, I found it to be acceptable, but it would have been useless in yesterday's snow. It was kinda handy when I was lazy or my back was hurting, but it wasn't any faster than doing it by hand. Maybe if the snow was particularly heavy but not too deep, it would have been an improvement in shoveling time, but when I didn't have back pain, I shovel pretty fast. But if you're a person who struggles with snow shoveling for any reason it will do the trick for most of our storms.

I had a 100ft cord (so similar length) and that let me do my entire property and my neighbours sidewalks. But cords suck in the winter, because unless you get a very good one, the cold stiffens the plastic casing making them a bit more unwieldy.

I started shovelling a huge driveway (probably could park 12 cars in it) by hand yesterday but buddy had one of those plug-in snowthrowers and it worked fine in yesterday's dump. It was slow going but I was pretty tired from just shovelling the sidewalk that it wouldn't likely have been faster to do that whole driveway by hand. They can't be driven hard into the snow like a gas snowblower. It also made quick work of the little dusting of snow we woke up to today.


RE: ION - Waterloo Region's Light Rail Transit - ac3r - 01-18-2022

(01-18-2022, 08:28 PM)ijmorlan Wrote: My point is, you said they put the tracks in the middle except where they can’t; but really they put the tracks in the middle precisely when there are two tracks together, on-street, with the one exception for those 2 short blocks. I haven’t seen any evidence that it has anything to do with what is “possible”.

(the other exception one might think of is the stop at King & Victoria, but there you see one track on each side of the street, continuing the rule that lone tracks are at the curb and a pair of tracks are in the middle)

Ah okay, I see what you mean now.

I dug out a copy of the printouts of the Cambridge line that RoW provided to me. Looks like the entire route is double track and doesn't split off at any point which is good for snow removal...though the part where it runs through a roundabout will be unusual to clear. I wonder how it'll be able to handle the gradient changes around the Grand River Valley. If you/anyone rides it between Mill and Block Line, I'm sure you can hear when the train loses grip, slows down, sprays a ton of sand and then speeds up again (seemingly in any weather, but particularly worse in the spring/autumn/winter). That incline is not that steep.

Also, maybe I have an older copy of the plans but I thought this ran through a roundabout which would make snow removal harder. I don't see any roundabouts in my documents.

[Image: 9DX57Zp.jpg]



RE: ION - Waterloo Region's Light Rail Transit - bravado - 01-18-2022

(01-18-2022, 08:58 PM)ac3r Wrote:
(01-18-2022, 08:28 PM)ijmorlan Wrote: My point is, you said they put the tracks in the middle except where they can’t; but really they put the tracks in the middle precisely when there are two tracks together, on-street, with the one exception for those 2 short blocks. I haven’t seen any evidence that it has anything to do with what is “possible”.

(the other exception one might think of is the stop at King & Victoria, but there you see one track on each side of the street, continuing the rule that lone tracks are at the curb and a pair of tracks are in the middle)

Ah okay, I see what you mean now.

I dug out a copy of the printouts of the Cambridge line that RoW provided to me. Looks like the entire route is double track and doesn't split off at any point which is good for snow removal...though the part where it runs through a roundabout will be unusual to clear. I wonder how it'll be able to handle the gradient changes around the Grand River Valley. If you/aneone rides it between Mill and Block Line, I'm sure you can hear when the train loses grip, slows down, sprays a ton of sand and then speeds up again (seemingly in any weather, but particularly worse in the spring/autumn/winter). That incline is not that steep.

Also, maybe I have an older copy of the plans but I thought this ran through a roundabout which would make snow removal harder. I don't see any roundabouts in my documents.

Stage 2 ION is supposed to go right through the roundabout at Beverly and Dundas that hasn't been built yet. This is the text version of their plans from a public consultation:

"When an ION vehicle approaches the roundabout, gates, bells and flashing lights will activate on the entry lanes to temporarily prevent vehicles from entering the roundabout until the train passes through. Exit lanes will remain open to allow any vehicles currently in the roundabout to exit safely before the train enters the intersection. The time required to complete this operation is minimal and is not anticipated to significantly impact traffic operations."

There is a photo of the route through the Beverly roundabout on Slide H:
http://rapidtransit.regionofwaterloo.ca/en/stage2ION/resources/Stage-2-PCC-5/Stage-2-ION-PCC-5-Preliminary-Design.pdf


RE: ION - Waterloo Region's Light Rail Transit - ac3r - 01-18-2022

Hmm, I wonder if you have an older proposal then? Mine are dated 2020, those are dated November 2019. Hard to say because there isn't much transparency when dealing with anyone in this region (and since I don't work with infrastructure, I don't have the most up to date information regarding that).

Here's the total keyplan that I have...

[Image: ZA1t9yy.jpg]

Also...

Quote:Exit lanes will remain open to allow any vehicles currently in the roundabout to exit safely before the train enters the intersection. The time required to complete this operation is minimal and is not anticipated to significantly impact traffic operations."

Lol. If it does indeed run through a roundabout, I'll be curious to see how the signaling works. If the train ends up having to halt to allow drivers to exit the roundabout before it can go through then... :| Par for the course here, I guess.


RE: ION - Waterloo Region's Light Rail Transit - bravado - 01-18-2022

(01-18-2022, 10:46 PM)ac3r Wrote: Hmm, I wonder if you have an older proposal then? Mine are dated 2020, those are dated November 2019. Hard to say because there isn't much transparency when dealing with anyone in this region (and since I don't work with infrastructure, I don't have the most up to date information regarding that).

Here's the total keyplan that I have...

[Image: ZA1t9yy.jpg]

I have to trust your more recent files and expertise on this one... but I do know that they're clearing the land at Beverly for the roundabout construction. Zone 32 is right where it would be.

Curious how they'll get around it if the 2019 plan isn't the same anymore... I've found that the Region staff is eager to help when I ask for things, but you have to bug first - they don't publish much of anything Sad


RE: ION - Waterloo Region's Light Rail Transit - ac3r - 01-18-2022

To be honest, I don't know much about the future LRT plans. I'm privy to some information since we rely on a lot of planning in my field, but since we aren't working directly with the rapid transit in the region I have to say I'm fairly clueless as in I don't know all the nuances and little updates. It'd be nice if the cities/region would provide consistent, up to date information on not only this, be it anything from new building projects to bike lanes to roads. That's bureaucracy I suppose...


RE: ION - Waterloo Region's Light Rail Transit - danbrotherston - 01-18-2022

(01-18-2022, 05:46 PM)tomh009 Wrote:
(01-18-2022, 04:42 PM)danbrotherston Wrote: Yes, like I said, I don't know what wattage the units I looked at were actually using, but there are a wide variety of units available with different battery system:

Here's the 1700 USD Toro unit I was quoting:

https://www.toro.com/en/homeowner/snow-blowers/power-max-60v-39926

Even if we take the same current draw of 3C (I used 5C which is a typical maximum draw for LiIon batteries) the larger batteries will lead to a wattage of 2700 Watts or 3.6 HP.

Given Toro has another unit for 999 USD that's also at 60 watts, seems like the Ryobi system is significantly less powerful for the price.  But obviously the blowers could be drawing less than maximum power.

I'm also not 100% sure how the power draw would be distributed, the motor should draw more power when under load, so it could be that the maximum power is significantly higher than 3C and 20 minutes is only the average runtime leading to an average draw of 3C.

Are those coulombs you are using for current? A coulomb is one ampere for the duration of one second, I think you want just plain old amperes (and then power is measured in watts, and one watt is equal to one amp at one volt).

Anyway, that Toro has two 7.5 Ah batteries. If it has the same 20-minute runtime at heavy load, then it's 22.5A x 60V x 2 = 2700W. That's roughly the same as a 20A household circuit. (Coulombs are generally not useful for calculating power as they include the time element.)

Of course, if the Toro can run only 10 minutes on those batteries, then the draw is much higher.

No, C in this case refers to charge rate. 1C means 1 hour charge and charge, so amps==amp hours. 3C means 20 mins run time. 

But again these are continuous numbers. I suspect snow blowers have some peaks and valleys in demand so we are only seeing an average when you look at duration.


RE: ION - Waterloo Region's Light Rail Transit - danbrotherston - 01-18-2022

(01-18-2022, 07:58 PM)tomh009 Wrote:
(01-18-2022, 05:54 PM)taylortbb Wrote: I believe Dan is referring to the C-rate, http://web.mit.edu/evt/summary_battery_specifications.pdf . It's a way of measuring discharge current that's normalized for battery capacity, a 1C discharge rate will fully discharge a battery in 1 hour. It basically measures how much stress a battery is under, as the safe discharge rate of a battery depends heavily on its capacity.

Ugh. Way to go whoever came up with this, using the symbol of a well-established SI unit to mean something completely different. 😥

Yes, an unfortunate choice of symbol.


RE: ION - Waterloo Region's Light Rail Transit - trainspotter139 - 01-19-2022

(01-18-2022, 02:41 PM)Bytor Wrote:
(01-17-2022, 07:30 PM)jeffster Wrote: Right.

It's been a long time since we had this type of crazy snow. CTV is saying 25-35 cm in the region, which might be the most in 20+ years.

Can't say were weren't warned, though I still feel bad for people stuck on highways (portions of the 401 in Toronto were closed as well). But at the same time, sometimes you just need to stay indoors until thing cleaned up.

We were warned, and rail is extremely easy to keep keep clear of snow. Even light rail. It wasn't snowing that fast as it took several hours before the 4cm had accumulated that the plows wait for before they start clearing the roads.

If GrandLinq/Keolis wasn't out there running a tram or or two all night to keep the tracks clear, that is incompetence on their part as we can easily expect multiple 5+ centimetre snow falls in a season, even in this day and age of climate change.

Also, how were the City snow plows allowed to just plow the snow over the LRT tracks? As easy as it is for light rail to keep up with falling snow, there's still such a thing as "too deep" for a tram. That is incompetence on the City's part to not make sure that didn't happen. It's also a bit more incompetence for GrandLinq to not expect such might happen and not have a rapid response contingency available.

They have a pretty bad operator shortage at the moment and are operating by maximizing Transport Canada limits on operator drive time and occasionally cancelling some train trips. If it were possible for them to operate trains after hours they would have. But when you hit that TC hours limit you're basically screwed.