Waterloo Region Connected
ION - Waterloo Region's Light Rail Transit - Printable Version

+- Waterloo Region Connected (https://www.waterlooregionconnected.com)
+-- Forum: Waterloo Region Works (https://www.waterlooregionconnected.com/forumdisplay.php?fid=14)
+--- Forum: Transportation and Infrastructure (https://www.waterlooregionconnected.com/forumdisplay.php?fid=25)
+--- Thread: ION - Waterloo Region's Light Rail Transit (/showthread.php?tid=14)

Pages: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353 354 355 356 357 358 359 360 361 362 363 364 365 366 367 368 369 370 371 372 373 374 375 376 377 378 379 380 381 382 383 384 385 386 387 388 389 390 391 392 393 394 395 396 397 398 399 400 401 402 403 404 405 406 407 408 409 410 411 412 413 414 415 416 417 418 419 420 421 422 423 424 425 426 427 428 429 430 431 432 433 434 435 436 437 438 439 440 441 442 443 444 445 446 447 448 449 450 451 452 453 454 455 456 457 458 459 460 461 462 463 464 465 466 467 468 469 470 471 472 473 474 475 476 477 478 479 480 481 482 483 484 485 486 487 488 489 490 491 492 493 494 495 496 497 498 499 500 501 502 503 504 505 506 507 508 509 510 511 512 513 514 515 516 517 518 519 520 521 522 523 524 525 526 527 528 529 530 531 532 533 534 535 536 537 538 539 540 541 542 543 544 545 546 547 548 549 550 551 552 553 554 555 556 557 558 559 560 561 562 563 564 565 566 567 568 569 570 571 572 573 574 575 576 577 578 579 580 581 582 583 584 585 586 587 588 589 590 591 592 593 594 595 596 597 598 599 600 601 602 603 604 605 606 607 608 609 610 611 612 613 614 615 616 617 618 619 620 621 622 623 624 625 626 627 628 629 630 631 632 633 634 635 636 637 638 639 640 641 642 643 644 645 646 647 648 649 650 651 652 653 654 655 656 657 658 659 660 661 662 663 664 665 666 667 668 669 670 671 672 673 674 675 676 677 678 679 680 681 682 683 684 685 686 687 688 689 690 691 692 693 694 695 696 697 698 699 700 701 702 703 704 705 706 707 708 709 710 711 712 713 714 715 716 717 718 719 720 721 722 723 724 725 726 727 728 729 730 731 732 733 734 735 736 737 738 739 740 741 742 743 744 745 746 747 748 749 750 751 752 753 754 755 756 757 758 759 760 761 762 763 764 765 766 767 768 769 770 771 772 773 774 775 776 777 778 779 780 781 782 783 784 785 786 787 788 789 790 791 792 793 794 795 796 797 798 799 800 801 802 803 804 805 806 807 808 809 810 811 812 813 814 815 816 817 818 819 820 821 822 823 824 825 826 827 828 829 830 831 832 833 834 835 836 837 838 839 840 841 842 843 844 845 846 847 848 849 850 851 852 853 854 855 856 857 858 859 860 861 862 863 864 865 866 867 868 869 870 871 872 873 874 875 876 877 878 879 880 881 882 883 884 885 886 887 888 889 890 891 892 893 894 895 896 897 898 899 900 901 902 903 904 905 906 907 908 909 910 911 912 913 914 915 916 917 918 919 920 921 922 923 924 925 926 927 928 929 930 931 932 933 934 935 936 937 938 939 940 941 942 943 944 945 946 947 948 949 950 951 952 953 954 955 956 957 958 959 960 961 962 963 964 965 966 967 968 969 970 971 972 973 974 975 976 977 978 979 980 981 982 983 984 985 986 987 988 989 990 991 992 993 994 995 996 997 998 999 1000 1001 1002 1003 1004 1005 1006 1007 1008 1009 1010 1011 1012 1013 1014 1015 1016 1017 1018 1019 1020 1021 1022 1023 1024 1025 1026 1027 1028 1029 1030 1031 1032 1033 1034 1035 1036 1037 1038 1039 1040 1041 1042 1043 1044 1045 1046 1047 1048 1049 1050 1051 1052 1053 1054 1055 1056 1057 1058 1059 1060 1061 1062 1063 1064 1065 1066 1067 1068 1069 1070 1071 1072 1073 1074 1075 1076 1077 1078 1079 1080 1081 1082 1083 1084 1085 1086 1087 1088 1089 1090 1091 1092 1093 1094 1095 1096 1097 1098 1099 1100 1101 1102 1103 1104 1105 1106 1107 1108 1109 1110 1111 1112 1113 1114 1115 1116 1117 1118 1119 1120 1121 1122 1123 1124 1125 1126 1127 1128 1129 1130 1131 1132 1133 1134 1135 1136 1137 1138 1139 1140 1141 1142 1143 1144 1145 1146 1147 1148 1149 1150 1151 1152 1153 1154 1155 1156 1157 1158 1159 1160 1161 1162 1163 1164 1165 1166


RE: ION - Waterloo Region's Light Rail Transit - danbrotherston - 12-28-2020

(12-27-2020, 11:51 PM)jeffster Wrote:
(12-27-2020, 09:35 PM)danbrotherston Wrote: I guess that's why no subway station in the world is a success....

Honestly, this is ridiculous, grade separated stations are expensive, but in no way impossible or difficult to do well. Obviously also possible to do poorly, as are at grade stations, the station at Block Line being an excellent example (it's terrible as is, utterly idiotic), and ironic that you bring up social safety given that the alignment on Block Line has probably the most dangerous situation in the city.

It's bizarre to be having this discussion, one venue over you'll find people explaining how at grade transit is always garbage. I've not taken the extreme view in either direction, instead basing my opinion on context. This bridge is already grade separated, the context leads to a grade separated station, nothing else.

Maybe you have never spent any time in Toronto, or any subway station for that matter, but two big differences: 1) Subway stations tend to be busy, even at slow times. The presence of other people is a deterrent. This isn't the case for Ion much past 8 or 9 PM. I know this because I have lived in Toronto, and I have used the Ion. One is always busy, one isn't. 2) There tends to be staff, security or police at subway stations. This doesn't seem to be the case for the Ion, as our stops are really no different than bus stops.

Putting the station down in the yards not only would have been more expensive but also not friendly at all for users. It would have been further for everyone to use. AODA compliance would have been a nightmare, not only would you need functioning elevators, you'd also need a ramp as back-up. Hindsight also suggests that it may have been a risk, with people taking shortcuts and cutting holes in fences, or by-passing fences that would need to have been built to keep people off of the yard tracks. While I have only seen minimal activity in the yards, it is there, and some idiot is bound to be run over by a slow moving train.

You do know that anyone that wanted to use the Ion from Homer Watson or Fallowfield area would have had to cross the bridge anyway, then backtrack toward Homer Watson and down stairs, a ramp, or an elevator. Not sure how you figured it would be closer to them.

It's almost like you didn't do any research on this.

Oh spare me, I've been in plenty of empty subway stations, not to mention GO stations and MiWay stations--you want to see empty stations go ride MiWay...and I do in fact see tons of security folks at ION stations, more than I've ever seen in a TTC station.

I've now explained a third time, so I'm just going to be blunt, it isn't farther for "everyone"...it's closer for everone to the west. I even gave you a map.

AODA compliance is not a "nightmare" any more than it is in any other grade separated station, and it's achieved easily through elevators. You do not need ramps as backup, no other system has that as a requirement to meet AODA compliance, not TTC, not GO Transit, not Ottawa Transit, not MiWay, so stop inventing requriements to try and make something appear to be impossible which has been done in a half dozen cities all over Ontario to say nothing of the rest of the world.

On tresspassing, people tresspass for a reason, if the station is designed to accomodate pedestrian movements, people will not tresspass...pretty simple. All of the tresspassing we have seen has been as a result of system design not accounting for pedestrian movement. Nobody is going to break into the railyard from the station, because if they wanted into the rail yard, it isn't in any way protected by fencing today.

As for backtracking let me be blunt, it's like you haven't even bothered to read to anything I wrote. How do you need to backtrack if the stairway goes straight into the station from the bridge...


RE: ION - Waterloo Region's Light Rail Transit - neonjoe - 12-28-2020

(12-23-2020, 09:15 PM)KevinL Wrote: It would be very strange having the only grade separated station on the line be in such a (currently) underdeveloped area. If they were going to similar expense to put in others I could understand, but then you have the budget increasing even more, which at the time would have killed the project.

I do have to wonder if a more gentle access to the rail corridor behind Graybar, rather than going along Hayward, would have made the curves less severe.

(12-27-2020, 10:01 PM)danbrotherston Wrote: For some context, I grabbed a sat photo, then copied the exact station platform under the bridge at the bridge pier...then I copied stairways from the Cooksville GO Station, where the stairway reaches the third floor of the parking garage. This is the maximum possible space a stairway would need, different configurations and lower heights could shrink and move this stairway as needed. You could have access from both sides of the bridge, and also an elevator for accessibility. It takes only a few dozen seconds to climb these stairs. The platform could be widened as needed to accomodate these features. The CP line under the bridge would need to be moved, but there is quite a bit of unused space there between the tracks.  And the Fallowfield buildings could be less than a 400 meter walk from the station.
I think the photoshop caused me to realize that there might have been some engineering or rework to the bridge structure itself to fit in the station and associated infrastructure unless an agreement with the railroads were to be made. The bridge embankment footings are just covered by quick copy and paste of the rails and platform. The bridge was built by and is owned by COK and not the region.
It definitely was a cost related decision rather that usability. The current station will be friendlier if the Vierra Village condos ever get built. I do agree right now it’s the most hostile station to passengers being right beside the road.


RE: ION - Waterloo Region's Light Rail Transit - danbrotherston - 12-28-2020

(12-28-2020, 09:38 AM)neonjoe Wrote:
(12-23-2020, 09:15 PM)KevinL Wrote: It would be very strange having the only grade separated station on the line be in such a (currently) underdeveloped area. If they were going to similar expense to put in others I could understand, but then you have the budget increasing even more, which at the time would have killed the project.

I do have to wonder if a more gentle access to the rail corridor behind Graybar, rather than going along Hayward, would have made the curves less severe.

(12-27-2020, 10:01 PM)danbrotherston Wrote: For some context, I grabbed a sat photo, then copied the exact station platform under the bridge at the bridge pier...then I copied stairways from the Cooksville GO Station, where the stairway reaches the third floor of the parking garage. This is the maximum possible space a stairway would need, different configurations and lower heights could shrink and move this stairway as needed. You could have access from both sides of the bridge, and also an elevator for accessibility. It takes only a few dozen seconds to climb these stairs. The platform could be widened as needed to accomodate these features. The CP line under the bridge would need to be moved, but there is quite a bit of unused space there between the tracks.  And the Fallowfield buildings could be less than a 400 meter walk from the station.
I think the photoshop caused me to realize that there might have been some engineering or rework to the bridge structure itself to fit in the station and associated infrastructure unless an agreement with the railroads were to be made. The bridge embankment footings are just covered by quick copy and paste of the rails and platform. The bridge was built by and is owned by COK and not the region.
It definitely was a cost related decision rather that usability. The current station will be friendlier if the Vierra Village condos ever get built. I do agree right now it’s the most hostile station to passengers being right beside the road.

The region already needed an agreement with the railway for other sections, I would expect moving the rail lines separately would have been the most feasible option for doing this.

Vierra would make the station feel better (not being in a field) but there may be some improved pedestrian connections but I expect several issues to remain including of course the ridiculous sidewalk tunnel on the other of block line. I feel a grade separated station could have been integrated or connected directly with the first (or basement) floor of the Vierra development, not exactly a magical experience but a good experience for residents and visitors to the development.


RE: ION - Waterloo Region's Light Rail Transit - Bob_McBob - 12-28-2020

Hopefully the last LRT collision of the year.

[Image: 9VjpcYh.jpg]


RE: ION - Waterloo Region's Light Rail Transit - neonjoe - 12-28-2020

I have seen so many vehicles at this intersection making a left from EB/NB Charles to Benton. (I’ve often been stuck waiting behind someone blocking the road waiting to make the illegal left)  I’m not surprised that this hasn’t happened more frequently.


RE: ION - Waterloo Region's Light Rail Transit - bgb_ca - 12-28-2020

(12-28-2020, 03:05 PM)neonjoe Wrote: I have seen so many vehicles at this intersection making a left from EB/NB Charles to Benton. (I’ve often been stuck waiting behind someone blocking the road waiting to make the illegal left)  I’m not surprised that this hasn’t happened more frequently.

This actually is King/Green. That intersection has a left turn arrow so I am guessing someone ignored the traffic lights.


RE: ION - Waterloo Region's Light Rail Transit - jwilliamson - 12-28-2020

(12-28-2020, 02:55 PM)Bob_McBob Wrote: Hopefully the last LRT collision of the year.

[Image: 9VjpcYh.jpg]

I was riding home with my daughter around noon and we had to get off at Central. I was wondering what happened and I guess this is it.


RE: ION - Waterloo Region's Light Rail Transit - Bob_McBob - 01-02-2021

Does anyone know why the entire ION system is shut down for "emergency repairs" today?

[Image: j4KPwb3.png]


RE: ION - Waterloo Region's Light Rail Transit - neonjoe - 01-03-2021

Could have been in anticipation of the freezing rain? In hindsight it really wasn’t a bad cleanup yesterday.


RE: ION - Waterloo Region's Light Rail Transit - ac3r - 01-03-2021

They shouldn't need to shut down an entire rapid transit system for a bit of freezing rain...


RE: ION - Waterloo Region's Light Rail Transit - Bob_McBob - 01-03-2021

It's not just the suspension of service, but also the near complete lack of communication and interaction with the public that has carried through from the construction phase. Shutting down an entire LRT system for a day should be a really big deal, but there's nothing in the news, nothing on official social media accounts, blank displays on platform signs (per Canard on Twitter), and just a vague description of "emergency repairs" buried on the GRT service alerts page.


RE: ION - Waterloo Region's Light Rail Transit - danbrotherston - 01-03-2021

(01-03-2021, 01:51 PM)Bob_McBob Wrote: It's not just the suspension of service, but also the near complete lack of communication and interaction with the public that has carried through from the construction phase. Shutting down an entire LRT system for a day should be a really big deal, but there's nothing in the news, nothing on official social media accounts, blank displays on platform signs (per Canard on Twitter), and just a vague description of "emergency repairs" buried on the GRT service alerts page.

Indeed!


RE: ION - Waterloo Region's Light Rail Transit - neonjoe - 01-03-2021

Maybe vandalism of some sort? They might avoid publicizing it to discourage copycats.


RE: ION - Waterloo Region's Light Rail Transit - danbrotherston - 01-03-2021

(01-03-2021, 03:14 PM)neonjoe Wrote: Maybe vandalism of some sort? They might avoid publicizing it to discourage copycats.

Damage that can shut down an entire transit line goes beyond vandalism.


RE: ION - Waterloo Region's Light Rail Transit - ac3r - 01-03-2021

There's nothing on the GRT_ROW Twitter account about it. It's not like we'd see the TTC shutdown the entire subway/streetcar network in Toronto but not give any sort of press release or update to social media, so I wonder why GRT thinks it's okay to leave 620'000 people in the dark about it.

Would it have really been the ice? There wasn't a whole lot in the end - certainly nothing that would be too much just for the LRV pantograph to break through on its own...it might spark a few times but that's pretty normal. They have sand dispensers on the vehicles as well that handle the traction.