Waterloo Region Connected
ION - Waterloo Region's Light Rail Transit - Printable Version

+- Waterloo Region Connected (https://www.waterlooregionconnected.com)
+-- Forum: Waterloo Region Works (https://www.waterlooregionconnected.com/forumdisplay.php?fid=14)
+--- Forum: Transportation and Infrastructure (https://www.waterlooregionconnected.com/forumdisplay.php?fid=25)
+--- Thread: ION - Waterloo Region's Light Rail Transit (/showthread.php?tid=14)

Pages: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353 354 355 356 357 358 359 360 361 362 363 364 365 366 367 368 369 370 371 372 373 374 375 376 377 378 379 380 381 382 383 384 385 386 387 388 389 390 391 392 393 394 395 396 397 398 399 400 401 402 403 404 405 406 407 408 409 410 411 412 413 414 415 416 417 418 419 420 421 422 423 424 425 426 427 428 429 430 431 432 433 434 435 436 437 438 439 440 441 442 443 444 445 446 447 448 449 450 451 452 453 454 455 456 457 458 459 460 461 462 463 464 465 466 467 468 469 470 471 472 473 474 475 476 477 478 479 480 481 482 483 484 485 486 487 488 489 490 491 492 493 494 495 496 497 498 499 500 501 502 503 504 505 506 507 508 509 510 511 512 513 514 515 516 517 518 519 520 521 522 523 524 525 526 527 528 529 530 531 532 533 534 535 536 537 538 539 540 541 542 543 544 545 546 547 548 549 550 551 552 553 554 555 556 557 558 559 560 561 562 563 564 565 566 567 568 569 570 571 572 573 574 575 576 577 578 579 580 581 582 583 584 585 586 587 588 589 590 591 592 593 594 595 596 597 598 599 600 601 602 603 604 605 606 607 608 609 610 611 612 613 614 615 616 617 618 619 620 621 622 623 624 625 626 627 628 629 630 631 632 633 634 635 636 637 638 639 640 641 642 643 644 645 646 647 648 649 650 651 652 653 654 655 656 657 658 659 660 661 662 663 664 665 666 667 668 669 670 671 672 673 674 675 676 677 678 679 680 681 682 683 684 685 686 687 688 689 690 691 692 693 694 695 696 697 698 699 700 701 702 703 704 705 706 707 708 709 710 711 712 713 714 715 716 717 718 719 720 721 722 723 724 725 726 727 728 729 730 731 732 733 734 735 736 737 738 739 740 741 742 743 744 745 746 747 748 749 750 751 752 753 754 755 756 757 758 759 760 761 762 763 764 765 766 767 768 769 770 771 772 773 774 775 776 777 778 779 780 781 782 783 784 785 786 787 788 789 790 791 792 793 794 795 796 797 798 799 800 801 802 803 804 805 806 807 808 809 810 811 812 813 814 815 816 817 818 819 820 821 822 823 824 825 826 827 828 829 830 831 832 833 834 835 836 837 838 839 840 841 842 843 844 845 846 847 848 849 850 851 852 853 854 855 856 857 858 859 860 861 862 863 864 865 866 867 868 869 870 871 872 873 874 875 876 877 878 879 880 881 882 883 884 885 886 887 888 889 890 891 892 893 894 895 896 897 898 899 900 901 902 903 904 905 906 907 908 909 910 911 912 913 914 915 916 917 918 919 920 921 922 923 924 925 926 927 928 929 930 931 932 933 934 935 936 937 938 939 940 941 942 943 944 945 946 947 948 949 950 951 952 953 954 955 956 957 958 959 960 961 962 963 964 965 966 967 968 969 970 971 972 973 974 975 976 977 978 979 980 981 982 983 984 985 986 987 988 989 990 991 992 993 994 995 996 997 998 999 1000 1001 1002 1003 1004 1005 1006 1007 1008 1009 1010 1011 1012 1013 1014 1015 1016 1017 1018 1019 1020 1021 1022 1023 1024 1025 1026 1027 1028 1029 1030 1031 1032 1033 1034 1035 1036 1037 1038 1039 1040 1041 1042 1043 1044 1045 1046 1047 1048 1049 1050 1051 1052 1053 1054 1055 1056 1057 1058 1059 1060 1061 1062 1063 1064 1065 1066 1067 1068 1069 1070 1071 1072 1073 1074 1075 1076 1077 1078 1079 1080 1081 1082 1083 1084 1085 1086 1087 1088 1089 1090 1091 1092 1093 1094 1095 1096 1097 1098 1099 1100 1101 1102 1103 1104 1105 1106 1107 1108 1109 1110 1111 1112 1113 1114 1115 1116 1117 1118 1119 1120 1121 1122 1123 1124 1125 1126 1127 1128 1129 1130 1131 1132 1133 1134 1135 1136 1137 1138 1139 1140 1141 1142 1143 1144 1145 1146 1147 1148 1149 1150 1151 1152 1153 1154 1155 1156 1157 1158 1159 1160 1161 1162 1163 1164 1165 1166


RE: ION - Waterloo Region's Light Rail Transit - danbrotherston - 12-13-2020

(12-13-2020, 12:46 PM)westwardloo Wrote: As much as I hate the observers anti LRT cartoons. I grew up in Elmira, and I understand their point. I do think that a by-pass is needed. Downtown Elmira hasn't been a good destination for shopping in my lifetime, but it is made even worse by the constant tractor trailer traffic zooming through it. Obviously this would divert some traffic from Arthur Street that might stop and shop, but I would hazard a guess most people shopping in downtown Elmira are from Elmira or the surrounding farms.

I certainly support a bypass but I got the sense the opposition to a bypass was strictly within Elmira.


RE: ION - Waterloo Region's Light Rail Transit - Bytor - 12-13-2020

(12-13-2020, 02:19 PM)danbrotherston Wrote:
(12-13-2020, 12:46 PM)westwardloo Wrote: As much as I hate the observers anti LRT cartoons. I grew up in Elmira, and I understand their point. I do think that a by-pass is needed. Downtown Elmira hasn't been a good destination for shopping in my lifetime, but it is made even worse by the constant tractor trailer traffic zooming through it. Obviously this would divert some traffic from Arthur Street that might stop and shop, but I would hazard a guess most people shopping in downtown Elmira are from Elmira or the surrounding farms.

I certainly support a bypass but I got the sense the opposition to a bypass was strictly within Elmira.

Well, look what the Charles/Duke loop did to DTK. That may only have been the straw that broke the camel's back, but we're still recovering from it today.


RE: ION - Waterloo Region's Light Rail Transit - tomh009 - 12-13-2020

(12-13-2020, 03:40 PM)Bytor Wrote:
(12-13-2020, 02:19 PM)danbrotherston Wrote: I certainly support a bypass but I got the sense the opposition to a bypass was strictly within Elmira.

Well, look what the Charles/Duke loop did to DTK. That may only have been the straw that broke the camel's back, but we're still recovering from it today.

The city was considering ways to rejuvenate the downtown long before they made Charles and Duke into one-way streets. It sure didn't help but that was not the root of the issue -- suburban sprawl and shopping malls were a much bigger factor in the original decline. And, as we have seen, once the downward spiral starts, it's awfully hard to reverse.


RE: ION - Waterloo Region's Light Rail Transit - trainspotter139 - 12-14-2020

(12-11-2020, 11:51 AM)ijmorlan Wrote:
(12-11-2020, 11:23 AM)danbrotherston Wrote: Wishful thinking?

I mean, I honestly do not understand the purpose of the restriction there...it's ridiculous...but I'm not a railway engineer, so I'm sure there's a good reason why a train can't do more than a jogging pace through an entirely segregated straight right of way next to a track where trains go four times the speed in the opposite direction.

Maybe there is something wrong with the track? It’s hard to imagine what would require such an extreme slowdown.

A similar case previously occurred on the southbound track approaching Erb St. They would slow to a crawl ahead of the switch for the freight crossover, then speed up a little before slowing down as they approached the crossing at Erb. I actually watched one and the slowdown appeared to be intended to apply to the switch itself, so I suspect there was an issue with the switch. What it was I can’t imagine; and if they were concerned about the switch not switching properly or staying in the proper location I think a better approach would have been to send out a crew every morning to clamp or bolt it in the LRT operating position, then reverse the procedure before the freight went through in the evening. But regardless, eventually it was fixed and while they still proceed rather slowly through the Erb St. crossing they at least approach it at a somewhat more reasonable speed.

Although a lot of this stuff is somewhat mysterious. I recently watched a video discussing an incident in Britain where a passenger train went through a slow order 100mph over the limit, at full track speed of about 125mph rather than the slow limit of 25mph (numbers might be slightly off, but not hugely off; it went through at 5 times the speed limit). It was a temporary slow order, not a curve or something like that. What is weird is that the limit for freight trains was 125mph! Indeed, the signage, with two numbers on it, one for passenger and one for freight, was a factor in the incident. I don’t understand how passenger trains could need to slow to 25mph while it’s still considered perfectly safe for freight to blow through at 125mph.

There's nothing wrong with the track there that is limiting the speed. It is, in fact, entirely based on the limitations of ATP. ATP is entirely limited by the human driver factor. Had we gone with an ATC system (which is much more expensive to implement) like what is being done on Line 5 Eglinton in Toronto that large section of crawling along at 15 km/h wouldn't exist since ATC essentially drives the train in ATC enabled sections. The curve speed limit for the Hayward section is 15 km/h. With ATC the system could calculate in real time and then implement the required braking to get the train to decelerate to 15 km/h before a point about 15m before entering the curve. ATP, since it's entirely dependent on human factors, requires a large buffer zone before the start of where speed restrictions are required to account for a driver failing to acknowledge the speed limit change, penalty grace period and potential subsequent penalty braking. The larger the change in speed limit, the larger that buffer zone must be.


RE: ION - Waterloo Region's Light Rail Transit - danbrotherston - 12-14-2020

(12-14-2020, 03:57 AM)trainspotter139 Wrote:
(12-11-2020, 11:51 AM)ijmorlan Wrote: Maybe there is something wrong with the track? It’s hard to imagine what would require such an extreme slowdown.

A similar case previously occurred on the southbound track approaching Erb St. They would slow to a crawl ahead of the switch for the freight crossover, then speed up a little before slowing down as they approached the crossing at Erb. I actually watched one and the slowdown appeared to be intended to apply to the switch itself, so I suspect there was an issue with the switch. What it was I can’t imagine; and if they were concerned about the switch not switching properly or staying in the proper location I think a better approach would have been to send out a crew every morning to clamp or bolt it in the LRT operating position, then reverse the procedure before the freight went through in the evening. But regardless, eventually it was fixed and while they still proceed rather slowly through the Erb St. crossing they at least approach it at a somewhat more reasonable speed.

Although a lot of this stuff is somewhat mysterious. I recently watched a video discussing an incident in Britain where a passenger train went through a slow order 100mph over the limit, at full track speed of about 125mph rather than the slow limit of 25mph (numbers might be slightly off, but not hugely off; it went through at 5 times the speed limit). It was a temporary slow order, not a curve or something like that. What is weird is that the limit for freight trains was 125mph! Indeed, the signage, with two numbers on it, one for passenger and one for freight, was a factor in the incident. I don’t understand how passenger trains could need to slow to 25mph while it’s still considered perfectly safe for freight to blow through at 125mph.

There's nothing wrong with the track there that is limiting the speed. It is, in fact, entirely based on the limitations of ATP. ATP is entirely limited by the human driver factor. Had we gone with an ATC system (which is much more expensive to implement) like what is being done on Line 5 Eglinton in Toronto that large section of crawling along at 15 km/h wouldn't exist since ATC essentially drives the train in ATC enabled sections. The curve speed limit for the Hayward section is 15 km/h. With ATC the system could calculate in real time and then implement the required braking to get the train to decelerate to 15 km/h before a point about 15m before entering the curve. ATP, since it's entirely dependent on human factors, requires a large buffer zone before the start of where speed restrictions are required to account for a driver failing to acknowledge the speed limit change, penalty grace period and potential subsequent penalty braking. The larger the change in speed limit, the larger that buffer zone must be.

I don't think I buy this explanation...the 15 km/h section starts a minute before the curve...we have lots of other turns which don't have similar ridiculous restrictions.


RE: ION - Waterloo Region's Light Rail Transit - ijmorlan - 12-14-2020

(12-14-2020, 10:34 AM)danbrotherston Wrote: I don't think I buy this explanation...the 15 km/h section starts a minute before the curve...we have lots of other turns which don't have similar ridiculous restrictions.

Are the turns with non-ridiculous speed limits in Line-Of-Sight (LOS) areas? I have no idea, I’m just wondering if that might be the difference.

It doesn’t really matter, because even if there is a reason that means they can’t just simply fix it, it still doesn’t justify it, because it is ridiculous for the train to have to go as slow as it does. This is similar to the O-Train “can’t operate with doors open even in an emergency without going back to 1800s scheduling technology” problem; regardless of the technical details, it’s ridiculous that they have such a problem. In both cases, whatever the detailed technical explanation, it just means the designers screwed up earlier in the process.


RE: ION - Waterloo Region's Light Rail Transit - danbrotherston - 12-14-2020

(12-14-2020, 02:36 PM)ijmorlan Wrote:
(12-14-2020, 10:34 AM)danbrotherston Wrote: I don't think I buy this explanation...the 15 km/h section starts a minute before the curve...we have lots of other turns which don't have similar ridiculous restrictions.

Are the turns with non-ridiculous speed limits in Line-Of-Sight (LOS) areas? I have no idea, I’m just wondering if that might be the difference.

It doesn’t really matter, because even if there is a reason that means they can’t just simply fix it, it still doesn’t justify it, because it is ridiculous for the train to have to go as slow as it does. This is similar to the O-Train “can’t operate with doors open even in an emergency without going back to 1800s scheduling technology” problem; regardless of the technical details, it’s ridiculous that they have such a problem. In both cases, whatever the detailed technical explanation, it just means the designers screwed up earlier in the process.

I'm thinking of the turn from Waterloo Park onto Caroline Rd. it's also moving from an ATP section to an on road section, now, the speed restriction is higher because it is a wider turn, but the speed restriction doesn't start hundreds of meters (yes, hundreds, I measured) away from the intersection as it does at Hayward.

I will also take this opportunity to once again argue that the LRT should have continued along the freight railway, to a grade separated station at Block Line, then turned towards the hydro corridor between the car dealership and the mattress place. While they were at it, they could have built segregated bike lanes and a sidewalk on Courtland, as well as a trail from Block line to Balzer Rd, as well as connecting to the back of the towers on Fallowfield cutting 600 meters off their walk to the LRT station.


RE: ION - Waterloo Region's Light Rail Transit - westwardloo - 12-14-2020

(12-13-2020, 03:40 PM)Bytor Wrote:
(12-13-2020, 02:19 PM)danbrotherston Wrote: I certainly support a bypass but I got the sense the opposition to a bypass was strictly within Elmira.

Well, look what the Charles/Duke loop did to DTK. That may only have been the straw that broke the camel's back, but we're still recovering from it today.
Obviously hard to know who is actually against the bypass. Anecdotally, speaking with people I know that own businesses downtown Elmira would love a by-pass. I think it has been put on the back burner do to it being a regional issue, if the township had the ability to build this they would have done it ages ago.  

Not sure if you have been downtown Elmira recently, but the camel's back already broke decades ago. I think traffic bypassing the downtown would have a minimum, if any effect on overall sales.  Obviously a much nicer of a town, but St. Jacobs downtown has definitely seen the benefits of reduced tracker trailer traffic zooming down the main street. 

Sorry to go off topic slightly.


RE: ION - Waterloo Region's Light Rail Transit - ijmorlan - 12-14-2020

(12-14-2020, 03:05 PM)danbrotherston Wrote:
(12-14-2020, 02:36 PM)ijmorlan Wrote: Are the turns with non-ridiculous speed limits in Line-Of-Sight (LOS) areas? I have no idea, I’m just wondering if that might be the difference.

It doesn’t really matter, because even if there is a reason that means they can’t just simply fix it, it still doesn’t justify it, because it is ridiculous for the train to have to go as slow as it does. This is similar to the O-Train “can’t operate with doors open even in an emergency without going back to 1800s scheduling technology” problem; regardless of the technical details, it’s ridiculous that they have such a problem. In both cases, whatever the detailed technical explanation, it just means the designers screwed up earlier in the process.

I'm thinking of the turn from Waterloo Park onto Caroline Rd. it's also moving from an ATP section to an on road section, now, the speed restriction is higher because it is a wider turn, but the speed restriction doesn't start hundreds of meters (yes, hundreds, I measured) away from the intersection as it does at Hayward.

Thanks for the example. That one had a slow area ahead of it at the switch for a while, but it seems to have been fixed and I agree it’s much more reasonable — it still looks pretty slow, but the slowness has some connection to the conditions we can observe. I have no idea whether the fact that the turn itself is in the LOS area affects how they handle it.

Quote:I will also take this opportunity to once again argue that the LRT should have continued along the freight railway, to a grade separated station at Block Line, then turned towards the hydro corridor between the car dealership and the mattress place. While they were at it, they could have built segregated bike lanes and a sidewalk on Courtland, as well as a trail from Block line to Balzer Rd, as well as connecting to the back of the towers on Fallowfield cutting 600 meters off their walk to the LRT station.

That does sound like a good idea — eliminate the jog at Hayward (with its 2 sharp turns), not to mention the crossings associated with Graybar and the pedestrian crossing at the corner with Courtland, as well as the crossing at Blockline and the crossings associated with the businesses between Courtland and the tracks. And eventually the station could essentially be in the Virerra Village basement, which would be really slick!


RE: ION - Waterloo Region's Light Rail Transit - KevinT - 12-21-2020

(12-14-2020, 03:05 PM)danbrotherston Wrote: I will also take this opportunity to once again argue that the LRT should have continued along the freight railway, to a grade separated station at Block Line, then turned towards the hydro corridor between the car dealership and the mattress place. While they were at it, they could have built segregated bike lanes and a sidewalk on Courtland, as well as a trail from Block line to Balzer Rd, as well as connecting to the back of the towers on Fallowfield cutting 600 meters off their walk to the LRT station.

I daydream about this every time I ride through that section. What a wasted opportunity...


RE: ION - Waterloo Region's Light Rail Transit - Bytor - 12-21-2020

(12-21-2020, 07:28 AM)KevinT Wrote:
(12-14-2020, 03:05 PM)danbrotherston Wrote: I will also take this opportunity to once again argue that the LRT should have continued along the freight railway, to a grade separated station at Block Line, then turned towards the hydro corridor between the car dealership and the mattress place. While they were at it, they could have built segregated bike lanes and a sidewalk on Courtland, as well as a trail from Block line to Balzer Rd, as well as connecting to the back of the towers on Fallowfield cutting 600 meters off their walk to the LRT station.

I daydream about this every time I ride through that section. What a wasted opportunity...

That would have been a bad route, IMO. Think of the work necessary to get accessible stairs and a ramp down to the bottom of the corridor for a station there. Also, the nearest track at the bottom is a bit more than 90m from the current station platform, straight line distance, so a switchback ramp and stairs at AODA maximum grade would potentially double that distance. That would add a couple minutes to get to the station for healthy people, more for people with mobility issues, and thus reduce the catchment area on the other side of Courtland Ave., not to mention how it makes transferring to and from busses less convenient, too.


RE: ION - Waterloo Region's Light Rail Transit - danbrotherston - 12-21-2020

(12-21-2020, 02:39 PM)Bytor Wrote:
(12-21-2020, 07:28 AM)KevinT Wrote: I daydream about this every time I ride through that section. What a wasted opportunity...

That would have been a bad route, IMO. Think of the work necessary to get accessible stairs and a ramp down to the bottom of the corridor for a station there. Also, the nearest track at the bottom is a bit more than 90m from the current station platform, straight line distance, so a switchback ramp and stairs at AODA maximum grade would potentially double that distance. That would add a couple minutes to get to the station for healthy people, more for people with mobility issues, and thus reduce the catchment area on the other side of Courtland Ave., not to mention how it makes transferring to and from busses less convenient, too.

And the station would have been closer to the buildings at Fallowfield, and Homer Watson.

As for "the work necessary"...this is the same work that's needed at every single grade separated station everywhere in the world.

I will be the first one to argue for ground level stations, they do provide better integration into the pedestrian realm, but in this instance, you're looking at a savings of 4-6 minutes travel time, plus a better street level realm (the current Courtland route is utter trash--partly because of the LRT routing), plus a trade off of better connections to some places, and worse connections to other places, seems like a very strong win.

Also, I question some of your numbers, the track in question is only 74 meters from the current station access (remember, street level design is trash), and the bridge pier is only 65 meters. And even if AODA ramps required a switchback (which they don't have, too, they could be accessed by elevator instead) most grade separated stations also have stairs which can be much shorter.  So you're really looking at a 65-70 meter further walk, plus stairs, and again, that's added to the Courtland side, but subtracted from the Fallowfield side.


RE: ION - Waterloo Region's Light Rail Transit - neonjoe - 12-21-2020

A station in the middle of a rail yard would be a lovely place to wait for a train.


RE: ION - Waterloo Region's Light Rail Transit - ijmorlan - 12-21-2020

(12-21-2020, 08:46 PM)neonjoe Wrote: A station in the middle of a rail yard would be a lovely place to wait for a train.

It would not be in the middle. It would be at the side and in that regard not really any different from the existing Block Line station, which is at the side of (“in the middle of”) a busy 4 lane road.


RE: ION - Waterloo Region's Light Rail Transit - danbrotherston - 12-21-2020

(12-21-2020, 08:46 PM)neonjoe Wrote: A station in the middle of a rail yard would be a lovely place to wait for a train.

You prefer 25 feet above a rail yard beside two massive five lane highways.

Honestly, I’ve waited at a station abutting a rail yard before, it really isn’t unpleasant at all.