Waterloo Region Connected
ION - Waterloo Region's Light Rail Transit - Printable Version

+- Waterloo Region Connected (https://www.waterlooregionconnected.com)
+-- Forum: Waterloo Region Works (https://www.waterlooregionconnected.com/forumdisplay.php?fid=14)
+--- Forum: Transportation and Infrastructure (https://www.waterlooregionconnected.com/forumdisplay.php?fid=25)
+--- Thread: ION - Waterloo Region's Light Rail Transit (/showthread.php?tid=14)

Pages: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353 354 355 356 357 358 359 360 361 362 363 364 365 366 367 368 369 370 371 372 373 374 375 376 377 378 379 380 381 382 383 384 385 386 387 388 389 390 391 392 393 394 395 396 397 398 399 400 401 402 403 404 405 406 407 408 409 410 411 412 413 414 415 416 417 418 419 420 421 422 423 424 425 426 427 428 429 430 431 432 433 434 435 436 437 438 439 440 441 442 443 444 445 446 447 448 449 450 451 452 453 454 455 456 457 458 459 460 461 462 463 464 465 466 467 468 469 470 471 472 473 474 475 476 477 478 479 480 481 482 483 484 485 486 487 488 489 490 491 492 493 494 495 496 497 498 499 500 501 502 503 504 505 506 507 508 509 510 511 512 513 514 515 516 517 518 519 520 521 522 523 524 525 526 527 528 529 530 531 532 533 534 535 536 537 538 539 540 541 542 543 544 545 546 547 548 549 550 551 552 553 554 555 556 557 558 559 560 561 562 563 564 565 566 567 568 569 570 571 572 573 574 575 576 577 578 579 580 581 582 583 584 585 586 587 588 589 590 591 592 593 594 595 596 597 598 599 600 601 602 603 604 605 606 607 608 609 610 611 612 613 614 615 616 617 618 619 620 621 622 623 624 625 626 627 628 629 630 631 632 633 634 635 636 637 638 639 640 641 642 643 644 645 646 647 648 649 650 651 652 653 654 655 656 657 658 659 660 661 662 663 664 665 666 667 668 669 670 671 672 673 674 675 676 677 678 679 680 681 682 683 684 685 686 687 688 689 690 691 692 693 694 695 696 697 698 699 700 701 702 703 704 705 706 707 708 709 710 711 712 713 714 715 716 717 718 719 720 721 722 723 724 725 726 727 728 729 730 731 732 733 734 735 736 737 738 739 740 741 742 743 744 745 746 747 748 749 750 751 752 753 754 755 756 757 758 759 760 761 762 763 764 765 766 767 768 769 770 771 772 773 774 775 776 777 778 779 780 781 782 783 784 785 786 787 788 789 790 791 792 793 794 795 796 797 798 799 800 801 802 803 804 805 806 807 808 809 810 811 812 813 814 815 816 817 818 819 820 821 822 823 824 825 826 827 828 829 830 831 832 833 834 835 836 837 838 839 840 841 842 843 844 845 846 847 848 849 850 851 852 853 854 855 856 857 858 859 860 861 862 863 864 865 866 867 868 869 870 871 872 873 874 875 876 877 878 879 880 881 882 883 884 885 886 887 888 889 890 891 892 893 894 895 896 897 898 899 900 901 902 903 904 905 906 907 908 909 910 911 912 913 914 915 916 917 918 919 920 921 922 923 924 925 926 927 928 929 930 931 932 933 934 935 936 937 938 939 940 941 942 943 944 945 946 947 948 949 950 951 952 953 954 955 956 957 958 959 960 961 962 963 964 965 966 967 968 969 970 971 972 973 974 975 976 977 978 979 980 981 982 983 984 985 986 987 988 989 990 991 992 993 994 995 996 997 998 999 1000 1001 1002 1003 1004 1005 1006 1007 1008 1009 1010 1011 1012 1013 1014 1015 1016 1017 1018 1019 1020 1021 1022 1023 1024 1025 1026 1027 1028 1029 1030 1031 1032 1033 1034 1035 1036 1037 1038 1039 1040 1041 1042 1043 1044 1045 1046 1047 1048 1049 1050 1051 1052 1053 1054 1055 1056 1057 1058 1059 1060 1061 1062 1063 1064 1065 1066 1067 1068 1069 1070 1071 1072 1073 1074 1075 1076 1077 1078 1079 1080 1081 1082 1083 1084 1085 1086 1087 1088 1089 1090 1091 1092 1093 1094 1095 1096 1097 1098 1099 1100 1101 1102 1103 1104 1105 1106 1107 1108 1109 1110 1111 1112 1113 1114 1115 1116 1117 1118 1119 1120 1121 1122 1123 1124 1125 1126 1127 1128 1129 1130 1131 1132 1133 1134 1135 1136 1137 1138 1139 1140 1141 1142 1143 1144 1145 1146 1147 1148 1149 1150 1151 1152 1153 1154 1155 1156 1157 1158 1159 1160 1161 1162 1163 1164 1165 1166


RE: ION - Waterloo Region's Light Rail Transit - Bytor - 12-02-2020

(12-01-2020, 11:01 PM)ac3r Wrote: Targets set by who, though? Targets don't mean much when they're made by the same business owners and politicians hoping to sell you a product. I could care less if the region and GranLinq set a random target and keep moving the goal post to make it sound like it was a resounding success.

I'm suspecting that you don't know what the ridership of the 7 + 200 was before, and that you also didn't know what ridership of is now, until somebody mentioned it in this thread.

(12-01-2020, 11:01 PM)ac3r Wrote: Now, I'm not hating on the ION in any way, I am very glad it was built

Yes, you are, because so much of what you say about it is just incorrect.


(12-01-2020, 11:01 PM)ac3r Wrote: But it was under construction for years

Three years. How long did you think a big infrastructure project would take?

(12-01-2020, 11:01 PM)ac3r Wrote: and yet the ridership isn't all that much more significant than it was when we only had the 7 and various iXpress routes doing more or less the exact same route.

That's why I said above that you probably didn't know the ridership before and after.

7 + 200 2018 July-December: 2,528,000
7 + ION 2019 July-December: 3,668,000

That's a 45% increase, year over year. Pretty significant, no?

(12-01-2020, 11:01 PM)ac3r Wrote: It's as slow as a worm trying to crawl across a sidewalk on a sunny day in July


How fast did you think it was going to be? It was never going to have a top speed better than a bus, thanks to not getting caught in traffic and the wider stop spacing it still ends up being a little faster than the 200 was.

(12-01-2020, 11:01 PM)ac3r Wrote: and it only covers a very very specific corridor of the city

So what? Each bus route only covers a "very very specific corridor of the city", too.

But guess what? The corridor that ION goes through happens to be the one where two-thirds of of all trips in Waterloo Region start or end (or both) every day.


(12-01-2020, 11:01 PM)ac3r Wrote: and is ultimately not that much faster than the bus routes it replaced - for me, it takes me less time to take the 8 downtown as it does the LRT and the route is almost virtually the same in terms of distance.

I've never compared ION to the 8, though I suspect that it's similar to comparing the ION to the 7. People claim the 7 is faster than the ION, but that's true over the distances where the ION's track deviates from the 7's route (i.e. around Mill and R&T stations) and only after 7pm in the evening when traffic congestion disappears.

(12-01-2020, 11:01 PM)ac3r Wrote: Most importantly, it has yet to do anything meaningful in regards to developing affordable housing and access to employers.

Most jobs in K-W lay along the the K-W portion of the Central Transit Corridor that Stage 1 ION runs. It's reliability over the 7 and 200 and added capacity means it is easier to get to employers along that corridor by transit. For example, the old route 22 use to go from Williamsburg northeast to the old Charles Terminal. The new 22 now goes from Williamsburg to Block Line Station, and anybody taking it and transferring to ION to go to work in DTK now has a 5 minute shorter trip, just by the schedules. If the person worked in Uptown and had to transfer to the 200 or 7 from the 2 before, this new trip is about 10 minute quicker. Plus, the new 20 isn't getting stuck in traffic congestion like the old 20 did as it wound its way to DTK. That traffic congestion also meant that a lot of people doing the old 20→200/7 to work in Uptown and the the reverse to get home missed the 20 when the 200 or 7 was late and they would have to wait another 30 minutes before the next one.

That is clearly a meaningful development in access to employers.

(12-01-2020, 11:01 PM)ac3r Wrote: Yeah it's easy to say "well don't worry, it's still new, the poor will love it one day" but people who live pay cheque to pay cheque don't give a shit how easy it might be to get to work in 5-10 years.

As described above, It became easier right away.


RE: ION - Waterloo Region's Light Rail Transit - Momo26 - 12-07-2020

I'm a little late to this discussion, but I talked and overheard people from day one on the ground...it took longer in morning commute for those coming from Cambridge that usually had the iExpress - Cambridge Centre to Charles St. Terminal and beyond? Vs Cambridge bus --> Fairway station switch to LRT --> downtown or beyond ie. Waterloo Conestoga Station. Plus no switching. Sit in your seat close your eyes and forget it.

I had to switch at the mall from the 110 or 10 to the 22 or the 7 (discovered this a bit later - lots of stops oof) so switching to LRT instead wasn't as big a deal. I liked the LRT more - smooth, almost guaranteed a seat, not stinky and felt cooler as it's on a track. But generally this was +8 to 10 mins total commute for me if I wasn't fortunate enough to make a train earlier + walk time slightly longer to workplace from LRT station on other end.

Now, I figured out another route to drop off at Block Line station, but it was more nip and tuck - lucky if we beat the train coming from Fairway And didn't get trapped at a crossing, or otherwise a brutal 9 minute wait in the cold as the one just left...no coordination whatsoever and the 10 mins intervals b.w. trai s are not the target 8 originally set out...


RE: ION - Waterloo Region's Light Rail Transit - Momo26 - 12-07-2020

Well sounds like folks have proved ridership overall was up when LRT started and in the first year (for GRT as a whole?) That's good if true.

That being said, I've said it before, I'll say it again - the city needs to make it easier to get aboard the LRT from some of the more suburban, And yet relatively dense areas, if the city, seamlessly and without needing to take 2 bloody busses to do so...your Conestoga College a s Pioneer areas, your Forest Glen areas, your Ira Needles, your Beechwoods and Laurelwoods, Stanley Parks and Bingemons...at least 8 to 12 tentacle lines would be ideal for the LRT...or short busses, a fleet of which run through neighborhoods every 15 mins connecting to a LRT that runs every 5 to 6 mins...you'll see an uptick...give an incentive to leave the car behind [Now mind you Sars-COVID probably threw a wrench into it all]


RE: ION - Waterloo Region's Light Rail Transit - neonjoe - 12-07-2020

Of the above I really only know the Forest Glen (Cointry Hills/Laurentides Hills) area well enough. Local routes 3, 16, 22, 33 all meander or through the area and connect to either Mill or Block Line Station. It seems like a lot of choice. Routes 12 and 26 also skirt the area and connect to iON.
The routes may not go down every local street but definitely within Country Hills they are easily walkable.


RE: ION - Waterloo Region's Light Rail Transit - Momo26 - 12-07-2020

Country Hills perhaps not the best example - I'm actually thinking a bit further out like in some examples I gave even so, more frequency is key - they can be smaller busses (smaller costs) and relatively seamless ...


RE: ION - Waterloo Region's Light Rail Transit - neonjoe - 12-07-2020

(12-07-2020, 11:31 AM)Momo26 Wrote: Country Hills perhaps not the best example - I'm actually thinking a bit further out like in some examples I gave  even so, more frequency is key - they can be smaller busses (smaller costs) and relatively seamless ...
They may be on track to do this. The region had an Tender out for 30' transit coaches. It looks like it was awarded.
https://regionofwaterloo.bidsandtenders.ca/Module/Tenders/en/Tender/Detail/44340c8e-ca9d-41c3-bff8-8ef58c3a6250


RE: ION - Waterloo Region's Light Rail Transit - danbrotherston - 12-07-2020

(12-07-2020, 01:54 PM)neonjoe Wrote:
(12-07-2020, 11:31 AM)Momo26 Wrote: Country Hills perhaps not the best example - I'm actually thinking a bit further out like in some examples I gave  even so, more frequency is key - they can be smaller busses (smaller costs) and relatively seamless ...
They may be on track to do this. The region had an Tender out for 30' transit coaches. It looks like it was awarded.
https://regionofwaterloo.bidsandtenders.ca/Module/Tenders/en/Tender/Detail/44340c8e-ca9d-41c3-bff8-8ef58c3a6250

I completely agree that frequency is key, but I don't think that smaller buses help that much, it would be nice to have a specific number on operating costs, but given that driver and maintenance will be about the same, and fuel will be a large fraction of a full size bus, I cannot imagine the savings is much, and the operation cost of having to manage a fleet with more than one type of bus isn't free either, it could literally come out negative.

I'm really of the opinion that we should focus strongly on last high frequency fixed route services from density nodes, while strongly facilitating last mile connections through things like bike lanes and bike and scooter shares.


RE: ION - Waterloo Region's Light Rail Transit - tomh009 - 12-07-2020

(12-07-2020, 02:09 PM)danbrotherston Wrote:
(12-07-2020, 01:54 PM)neonjoe Wrote: They may be on track to do this. The region had an Tender out for 30' transit coaches. It looks like it was awarded.
https://regionofwaterloo.bidsandtenders.ca/Module/Tenders/en/Tender/Detail/44340c8e-ca9d-41c3-bff8-8ef58c3a6250

I completely agree that frequency is key, but I don't think that smaller buses help that much, it would be nice to have a specific number on operating costs, but given that driver and maintenance will be about the same, and fuel will be a large fraction of a full size bus, I cannot imagine the savings is much, and the operation cost of having to manage a fleet with more than one type of bus isn't free either, it could literally come out negative.

GRT currently already runs a mixed fleet of New Flyer and Nova buses. And the BusPlus fleet has Chevrolet, Ford and GMC chassis with five (!) different coach bodies and three different engines. So, I don't think adding four Grande West buses to the fleet will have that big an impact.

The fuel economy is likely about 20% better -- and the buses will also be less expensive than full-sized ones. I do assume that they are capable of doing a financial analysis on this.


RE: ION - Waterloo Region's Light Rail Transit - plam - 12-07-2020

(12-07-2020, 02:09 PM)danbrotherston Wrote:
(12-07-2020, 01:54 PM)neonjoe Wrote: They may be on track to do this. The region had an Tender out for 30' transit coaches. It looks like it was awarded.
https://regionofwaterloo.bidsandtenders.ca/Module/Tenders/en/Tender/Detail/44340c8e-ca9d-41c3-bff8-8ef58c3a6250

I completely agree that frequency is key, but I don't think that smaller buses help that much, it would be nice to have a specific number on operating costs, but given that driver and maintenance will be about the same, and fuel will be a large fraction of a full size bus, I cannot imagine the savings is much, and the operation cost of having to manage a fleet with more than one type of bus isn't free either, it could literally come out negative.

I'm really of the opinion that we should focus strongly on last high frequency fixed route services from density nodes, while strongly facilitating last mile connections through things like bike lanes and bike and scooter shares.

I think short buses are often not the win for the reasons you say. The only thing is the perceived wastefulness of an empty bus. But perceived wastefulness of a single-occupant car is somehow fine. There must be some studies about this.


RE: ION - Waterloo Region's Light Rail Transit - taylortbb - 12-07-2020

(12-07-2020, 04:53 PM)tomh009 Wrote:
(12-07-2020, 02:09 PM)danbrotherston Wrote: I completely agree that frequency is key, but I don't think that smaller buses help that much, it would be nice to have a specific number on operating costs, but given that driver and maintenance will be about the same, and fuel will be a large fraction of a full size bus, I cannot imagine the savings is much, and the operation cost of having to manage a fleet with more than one type of bus isn't free either, it could literally come out negative.

GRT currently already runs a mixed fleet of New Flyer and Nova buses. And the BusPlus fleet has Chevrolet, Ford and GMC chassis with five (!) different coach bodies and three different engines. So, I don't think adding four Grande West buses to the fleet will have that big an impact.

The fuel economy is likely about 20% better -- and the buses will also be less expensive than full-sized ones. I do assume that they are capable of doing a financial analysis on this.

The BusPlus fleet isn't owned/operated by GRT. It's entirely contracted out to private operators. So GRT really only has the two bus types, and lots of the equipment (e.g. engines, HVAC units) are shared between them. I believe they also keep the Cambridge garage (as it's smaller) all single-type to further reduce the amount of complexity.

I do believe that GRT has done the analysis and concluded it was positive or they wouldn't have ordered the buses. But it's also true that GRT tries really hard to standardize, and small buses don't represent nearly the savings that many expect. They're starting with a small pilot and will see how it goes, which I think is a pretty responsible way to look at small buses. It's still important to push back on the persistent myth of large savings to be found just by ordering smaller buses.


RE: ION - Waterloo Region's Light Rail Transit - danbrotherston - 12-07-2020

(12-07-2020, 04:53 PM)tomh009 Wrote:
(12-07-2020, 02:09 PM)danbrotherston Wrote: I completely agree that frequency is key, but I don't think that smaller buses help that much, it would be nice to have a specific number on operating costs, but given that driver and maintenance will be about the same, and fuel will be a large fraction of a full size bus, I cannot imagine the savings is much, and the operation cost of having to manage a fleet with more than one type of bus isn't free either, it could literally come out negative.

GRT currently already runs a mixed fleet of New Flyer and Nova buses. And the BusPlus fleet has Chevrolet, Ford and GMC chassis with five (!) different coach bodies and three different engines. So, I don't think adding four Grande West buses to the fleet will have that big an impact.

The fuel economy is likely about 20% better -- and the buses will also be less expensive than full-sized ones. I do assume that they are capable of doing a financial analysis on this.

There is an operational complexity as well...right now any bus can go run any route, you only need one type of hot standby, if you start running smaller buses on some routes at some times, the operational complexity increases. They had this challenge with iXpress (and actually also ION BRT buses), and its why ixpress buses started getting run on other routes.

I am sure they are doing a cost analysis, but I'm saying the improvement is probably not much, if fuel economy is 20% better, and the buses were half as much, it's still possible we're saying less than 10% of the cost of those routes.

I often hear of smaller buses (sometimes even vans or cars) being a magic bullet for better transit, and in general, I don't think that's the case. Frequency is absolutely important, but I suspect most routes which are seeing smaller buses are not seeing a high frequency...transit agencies like ours are barely willing to prioritize frequency over cost on heavily used routes.


RE: ION - Waterloo Region's Light Rail Transit - neonjoe - 12-07-2020

How much time is left in the busPlus contracts? Maybe the smaller buses are mean to facilitate new busPlus type routes without breaching any contracts with the existing contractor.


RE: ION - Waterloo Region's Light Rail Transit - Bytor - 12-07-2020

(12-07-2020, 12:29 AM)Momo26 Wrote: Well sounds like folks have proved ridership overall was up when LRT started and in the first year (for GRT as a whole?) That's good if true.

Well, that's a rather backhanded comment.

(12-07-2020, 12:29 AM)Momo26 Wrote: That being said, I've said it before, I'll say it again - the city needs to make it easier to get aboard the LRT from some of the more suburban, And yet relatively  dense areas, if the city, seamlessly and without needing to take 2 bloody busses to do so...your Conestoga College a s Pioneer areas, your Forest Glen areas, your Ira Needles, your Beechwoods and Laurelwoods, Stanley Parks and Bingemons...at least 8 to 12 tentacle lines would be ideal for the LRT...or short busses, a fleet of which run through  neighborhoods every 15 mins connecting to a LRT that runs every 5 to 6 mins...you'll see an uptick...give an incentive to leave the car behind [Now mind you Sars-COVID probably threw a wrench into it all]

Transfers are not something to be afraid of and usually either speed things up or increase frequency. I would encourage you to read this. https://humantransit.org/2009/04/why-transferring-is-good-for-you-and-good-for-your-city.html

But…

Conestoga College → the 10 and the 110 connect to Fairway Station

Forest Glen Plaza → the 22, 33, and 201 connect to Block Line Station, the 12 connects to Fairway Station, the 12→Fairway Station and the 205+3→ Mill Station also bracket Country Hills, Country Hills West, and Williamsburg

Ira Needles/Boardwalk → the 204+1 to Queen and Frederick Stations, the 20 to Central Station, the4 to Grand River Hospital Station, the 5 to Waterloo Public Square and Caroline Stations.

Beachwood & Laurelwood → the 13, 29, 31 to UW station

And here I'm just going to stop and tell you to look at the damn maps yourself. You didn't know the numbers and you obviously don't know the network, so might I suggest that you go try a little self-education before you want to make complaints that only make you look ignorant?


RE: ION - Waterloo Region's Light Rail Transit - Bytor - 12-07-2020

(12-07-2020, 11:31 AM)Momo26 Wrote: Country Hills perhaps not the best example - I'm actually thinking a bit further out like in some examples I gave  even so, more frequency is key - they can be smaller busses (smaller costs) and relatively seamless ...

Smaller busses aren't smaller costs, though. The short busses, even though they only can carry 1/4 the passengers they still use close to half the fuel of the full-sized ones. And since the fixed cost of a driver is the same, the end result is the short busses have a higher operating cost per ride than the full sized ones and as such if the route ever has more than 20 riders on a segment at at time it's cheaper to use a full sized buss than two small ones.


RE: ION - Waterloo Region's Light Rail Transit - Bytor - 12-07-2020

(12-07-2020, 04:53 PM)tomh009 Wrote:
(12-07-2020, 02:09 PM)danbrotherston Wrote: I completely agree that frequency is key, but I don't think that smaller buses help that much, it would be nice to have a specific number on operating costs, but given that driver and maintenance will be about the same, and fuel will be a large fraction of a full size bus, I cannot imagine the savings is much, and the operation cost of having to manage a fleet with more than one type of bus isn't free either, it could literally come out negative.

GRT currently already runs a mixed fleet of New Flyer and Nova buses. And the BusPlus fleet has Chevrolet, Ford and GMC chassis with five (!) different coach bodies and three different engines. So, I don't think adding four Grande West buses to the fleet will have that big an impact.

The fuel economy is likely about 20% better -- and the buses will also be less expensive than full-sized ones. I do assume that they are capable of doing a financial analysis on this.

If you go and look up the diesel mileage of the short busses you'll find that they use about half the diesel as full sized one. However, they only carry 1/4 the passengers. So you're spending 2x the driver costs and 1x the fuel costs on half the passengers.