Waterloo Region Connected
ION - Waterloo Region's Light Rail Transit - Printable Version

+- Waterloo Region Connected (https://www.waterlooregionconnected.com)
+-- Forum: Waterloo Region Works (https://www.waterlooregionconnected.com/forumdisplay.php?fid=14)
+--- Forum: Transportation and Infrastructure (https://www.waterlooregionconnected.com/forumdisplay.php?fid=25)
+--- Thread: ION - Waterloo Region's Light Rail Transit (/showthread.php?tid=14)

Pages: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353 354 355 356 357 358 359 360 361 362 363 364 365 366 367 368 369 370 371 372 373 374 375 376 377 378 379 380 381 382 383 384 385 386 387 388 389 390 391 392 393 394 395 396 397 398 399 400 401 402 403 404 405 406 407 408 409 410 411 412 413 414 415 416 417 418 419 420 421 422 423 424 425 426 427 428 429 430 431 432 433 434 435 436 437 438 439 440 441 442 443 444 445 446 447 448 449 450 451 452 453 454 455 456 457 458 459 460 461 462 463 464 465 466 467 468 469 470 471 472 473 474 475 476 477 478 479 480 481 482 483 484 485 486 487 488 489 490 491 492 493 494 495 496 497 498 499 500 501 502 503 504 505 506 507 508 509 510 511 512 513 514 515 516 517 518 519 520 521 522 523 524 525 526 527 528 529 530 531 532 533 534 535 536 537 538 539 540 541 542 543 544 545 546 547 548 549 550 551 552 553 554 555 556 557 558 559 560 561 562 563 564 565 566 567 568 569 570 571 572 573 574 575 576 577 578 579 580 581 582 583 584 585 586 587 588 589 590 591 592 593 594 595 596 597 598 599 600 601 602 603 604 605 606 607 608 609 610 611 612 613 614 615 616 617 618 619 620 621 622 623 624 625 626 627 628 629 630 631 632 633 634 635 636 637 638 639 640 641 642 643 644 645 646 647 648 649 650 651 652 653 654 655 656 657 658 659 660 661 662 663 664 665 666 667 668 669 670 671 672 673 674 675 676 677 678 679 680 681 682 683 684 685 686 687 688 689 690 691 692 693 694 695 696 697 698 699 700 701 702 703 704 705 706 707 708 709 710 711 712 713 714 715 716 717 718 719 720 721 722 723 724 725 726 727 728 729 730 731 732 733 734 735 736 737 738 739 740 741 742 743 744 745 746 747 748 749 750 751 752 753 754 755 756 757 758 759 760 761 762 763 764 765 766 767 768 769 770 771 772 773 774 775 776 777 778 779 780 781 782 783 784 785 786 787 788 789 790 791 792 793 794 795 796 797 798 799 800 801 802 803 804 805 806 807 808 809 810 811 812 813 814 815 816 817 818 819 820 821 822 823 824 825 826 827 828 829 830 831 832 833 834 835 836 837 838 839 840 841 842 843 844 845 846 847 848 849 850 851 852 853 854 855 856 857 858 859 860 861 862 863 864 865 866 867 868 869 870 871 872 873 874 875 876 877 878 879 880 881 882 883 884 885 886 887 888 889 890 891 892 893 894 895 896 897 898 899 900 901 902 903 904 905 906 907 908 909 910 911 912 913 914 915 916 917 918 919 920 921 922 923 924 925 926 927 928 929 930 931 932 933 934 935 936 937 938 939 940 941 942 943 944 945 946 947 948 949 950 951 952 953 954 955 956 957 958 959 960 961 962 963 964 965 966 967 968 969 970 971 972 973 974 975 976 977 978 979 980 981 982 983 984 985 986 987 988 989 990 991 992 993 994 995 996 997 998 999 1000 1001 1002 1003 1004 1005 1006 1007 1008 1009 1010 1011 1012 1013 1014 1015 1016 1017 1018 1019 1020 1021 1022 1023 1024 1025 1026 1027 1028 1029 1030 1031 1032 1033 1034 1035 1036 1037 1038 1039 1040 1041 1042 1043 1044 1045 1046 1047 1048 1049 1050 1051 1052 1053 1054 1055 1056 1057 1058 1059 1060 1061 1062 1063 1064 1065 1066 1067 1068 1069 1070 1071 1072 1073 1074 1075 1076 1077 1078 1079 1080 1081 1082 1083 1084 1085 1086 1087 1088 1089 1090 1091 1092 1093 1094 1095 1096 1097 1098 1099 1100 1101 1102 1103 1104 1105 1106 1107 1108 1109 1110 1111 1112 1113 1114 1115 1116 1117 1118 1119 1120 1121 1122 1123 1124 1125 1126 1127 1128 1129 1130 1131 1132 1133 1134 1135 1136 1137 1138 1139 1140 1141 1142 1143 1144 1145 1146 1147 1148 1149 1150 1151 1152 1153 1154 1155 1156 1157 1158 1159 1160 1161 1162 1163 1164 1165 1166


RE: ION - Waterloo Region's Light Rail Transit - ac3r - 02-25-2020

(02-24-2020, 10:16 PM)ijmorlan Wrote:
(02-24-2020, 09:02 PM)danbrotherston Wrote: Are there any electric freight in N/A? Certainly there is none in Canada. I think we're all aware that our railroad regs are terribly obsolete compared with other places, so it makes sense that those places have better regs in this context as well.

That being said, I'm not sure breaking it up would help any, I wouldn't be at all surprised to hear that they require both directions to be unpowered before freight proceeds.

As far as I know, you are right about electric freight in North America. I will say that I suspect there probably is some oddball system somewhere, but basically none.

That's correct. There are a couple electric freight lines in North America, but they're mostly small operations/private railroads. Some examples include the Navajo Mine RailroadDeseret Power Railroad and the very short Iowa Traction Railway. BC Rail used to operate one in the Rockies in British Columbia to serve a coal mine, but it's now abandoned.


RE: ION - Waterloo Region's Light Rail Transit - jamincan - 02-25-2020

There are a few examples of long freight tunnels out west that were electrified; I think they have all either been closed or had better ventilation installed to allow diesel locomotives to run in them. I believe the Mount Royal Tunnel also used to have freight traffic, although I think it's now only commuter trains.


RE: ION - Waterloo Region's Light Rail Transit - ijmorlan - 02-25-2020

(02-25-2020, 01:38 AM)taylortbb Wrote: The original system design had three tracks, with the freight one having a crash wall separating it from the LRV tracks. Basically Transport Canada wants LRVs to be safe even if a freight train derails, and they're not rated for that kind of impact. Perhaps they use the station as a pseudo crash wall, providing isolation between LRV and freight.

You might be right about the pseudo crash wall. I never thought of that.

But what is certain is that this sort of paranoia is completely unnecessary for this particular line. Even if the freight were to derail, which is unlikely on the high-quality, constantly-maintained LRT tracks, at the speeds it goes on this line it would just settle down onto the ballast and sit there, not tip over or send trucks flying across the neighbourhood or into the path of an LRV.


RE: ION - Waterloo Region's Light Rail Transit - trainspotter139 - 02-25-2020

(02-25-2020, 09:16 AM)ijmorlan Wrote:
(02-25-2020, 01:38 AM)taylortbb Wrote: The original system design had three tracks, with the freight one having a crash wall separating it from the LRV tracks. Basically Transport Canada wants LRVs to be safe even if a freight train derails, and they're not rated for that kind of impact. Perhaps they use the station as a pseudo crash wall, providing isolation between LRV and freight.

You might be right about the pseudo crash wall. I never thought of that.

But what is certain is that this sort of paranoia is completely unnecessary for this particular line. Even if the freight were to derail, which is unlikely on the high-quality, constantly-maintained LRT tracks, at the speeds it goes on this line it would just settle down onto the ballast and sit there, not tip over or send trucks flying across the neighbourhood or into the path of an LRV.

When reverse running on the northbound track the crossover for LRVs to rejoin the southbound track is further south of the crossover used by CN freight trains. There would be an exclusive interlocking block that spans both switches and well past them in both directions that can't be occupied by an LRV if the freight train is using freight crossover or the switches won't operate. 

Overhead view for context:
   


RE: ION - Waterloo Region's Light Rail Transit - ijmorlan - 02-25-2020

(02-25-2020, 09:48 AM)trainspotter139 Wrote: When reverse running on the northbound track the crossover for LRVs to rejoin the southbound track is further south of the crossover used by CN freight trains. There would be an exclusive interlocking block that spans both switches and well past them in both directions that can't be occupied by an LRV if the freight train is using freight crossover or the switches won't operate. 

Yes, I am well aware of the layout of the interlocking. As far as I can tell it actually starts at the corner of William/Willow on the freight line and just past the Public Square stop on the LRT, and extends up to near the Perimeter Institute. On the southbound LRT track it appears to end just north of Caroline/Erb.

My point is that southbound LRVs could hold at Seagram until the freight train enters the interlocking, then proceed until they reach the BUR 2S signal and wait there for the freight to clear the interlocking. There is no need for them to hold 600m up the track. Holding at Seagram if they have to wait for the freight to even arrive makes sense because it allows people to get on or off if they want to, but once the freight is on scene it makes sense to proceed closer to the actual point of conflict.

That being said, if they are waiting at Seagram for more than a couple of minutes they should simply set the interlocking to allow the LRV through and have the freight wait for a gap in LRV traffic.

Really there are 2 separate issues: (1) the need for LRT traffic to use a single track while the freight is travelling along the line, and (2) the need for LRT traffic to stop entirely to allow the freight to cross over to its track. The problems with (1) are inherent to running a service more frequent than twice the time to traverse the single track segment, while I suspect the problems with (2) are mostly related to safety paranoia which ignores the fact that there is a difference between a mainline freight train travelling at 100km/h and the small trains travelling on our line at barely more than a jogging speed.


RE: ION - Waterloo Region's Light Rail Transit - tomh009 - 02-25-2020

Another dangerous turn in front of the LRT this morning, in spite of the traffic lights clearly forbidding the right turn due the LRT. LRT driver leaning on the horn, to no effect.

The difference? This time it was a Greyhound bus turning onto Ontario St S and the old bus depot.


RE: ION - Waterloo Region's Light Rail Transit - Bob_McBob - 02-25-2020

Summarizing my scanner and LRV tracking last night:

23:30 511 instructed to hold at Waterloo Public Square for CN freight.

23:37 Control tells 511 they're "cancelling the freight route" due to a "hiccup".

23:42 511 instructed to proceed, 11:25 behind schedule, and do a "quick turnaround" at Conestoga (the operator walked from one end to the other and immediately departed to maintain the schedule).

~00:00 Control sends someone to check the derail and high/wide sensors in uptown.

00:30 504 instructed to hold at Waterloo Public Square for a second attempt by CN.

00:43 Control asks 504 if they have eyes on CN, and the operator says no. At this point 507 is also holding at Allen, but southbound service on the spur line has ended for the night.

00:50 504 finally authorized to proceed, 20 minutes behind schedule. 507 was released a few minutes later.

00:56 504 asks Control about catching up to the freight train, and whether to dwell at R&T. Control instructs them to "pass at 20km/h". Again, I may have misinterpreted this part due to people talking at home, which is unfortunate since it's a critical detail.


RE: ION - Waterloo Region's Light Rail Transit - Bob_McBob - 02-26-2020

CN is running a train in a few minutes if anyone cares to listen in.

http://cykf.net/Liveatc/Transit.php


RE: ION - Waterloo Region's Light Rail Transit - Bob_McBob - 02-26-2020

Tonight's run:

22:58 Control mentions the freight train will be coming through in 7 minutes.

23:10 Control tells 508 (just departing Conestoga) they will be crossing over at Northfield and reverse running to Bauer (the crossover just before Erb and Caroline).

23:13 Line services confirms derail deactivation.

23:16 512 arrives at Waterloo Public Square and asks Control to "cancel the gate" (e.g. allow them to proceed) but Control tells them CN freight will be passing through imminently and they will have to wait.

23:23 Control tells 508 (now at Laurier-Waterloo Park) "you will have aspect at Bauer 2 Sierra crossing over southbound".

23:26 512 is cleared to depart Waterloo Public Square (10:44 behind schedule), right after 508 reaches Willis Way after crossing back over.

23:26 Control warns 506 (just departing Conestoga) they will be held at Northfield.

23:30 506 is held at Northfield.

23:35 506 is simultaneously cleared to proceed southbound from Northfield (5:47 behind schedule) as 512 arrives northbound, meaning CN freight is no longer on the line.

So it would seem reverse running southbound or regular running northbound while CN freight is on the spur line isn't an issue, which explains how an LRV was able to pass it last night. Most of the delay is just waiting for CN freight to get past the derail and interchange as well as ION only having access to a single track for both directions. This can impact up to 4 LRVs if the timing is bad because of all the various holds involved.


RE: ION - Waterloo Region's Light Rail Transit - ijmorlan - 02-26-2020

(02-26-2020, 01:03 AM)Bob_McBob Wrote: Tonight's run:

22:58 Control mentions the freight train will be coming through in 7 minutes.

23:10 Control tells 508 (just departing Conestoga) they will be crossing over at Northfield and reverse running to Bauer (the crossover just before Erb and Caroline).

23:13 Line services confirms derail deactivation.

23:16 512 arrives at Waterloo Public Square and asks Control to "cancel the gate" (e.g. allow them to proceed) but Control tells them CN freight will be passing through imminently and they will have to wait.

23:23 Control tells 508 (now at Laurier-Waterloo Park) "you will have aspect at Bauer 2 Sierra crossing over southbound".

23:26 512 is cleared to depart Waterloo Public Square (10:44 behind schedule), right after 508 reaches Willis Way after crossing back over.

23:26 Control warns 506 (just departing Conestoga) they will be held at Northfield.

23:30 506 is held at Northfield.

23:35 506 is simultaneously cleared to proceed southbound from Northfield (5:47 behind schedule) as 512 arrives northbound, meaning CN freight is no longer on the line.

So it would seem reverse running southbound or regular running northbound while CN freight is on the spur line isn't an issue, which explains how an LRV was able to pass it last night. Most of the delay is just waiting for CN freight to get past the derail and interchange as well as ION only having access to a single track for both directions. This can impact up to 4 LRVs if the timing is bad because of all the various holds involved.

23:16 - I wonder where 508 was when 512 asked to proceed immediately? I can’t tell for sure but it’s entirely possible 508 was already in the single-track segment, meaning somebody would have to wait because of the single track, never mind the freight crossing through Uptown.

23:35 - 506 went on the usual southbound track? I’m just wondering because if 512 had arrived northbound, 506 could have reverse-run on the northbound track.

Thanks for all these details! Very interesting.


RE: ION - Waterloo Region's Light Rail Transit - Bob_McBob - 02-26-2020

(02-26-2020, 08:23 AM)ijmorlan Wrote: 23:16 - I wonder where 508 was when 512 asked to proceed immediately? I can’t tell for sure but it’s entirely possible 508 was already in the single-track segment, meaning somebody would have to wait because of the single track, never mind the freight crossing through Uptown.

23:35 - 506 went on the usual southbound track? I’m just wondering because if 512 had arrived northbound, 506 could have reverse-run on the northbound track.

At 23:16, 508 was just crossing over to reverse run at Northfield, so 512 wouldn't have been able to use the regular northbound track, and I assume the other track was locked out for CN. At 23:35, 506 departed Northfield using the regular southbound track just as 512 arrived on the regular northbound track, so CN must have already switched to the third track and crossed Northfield. I've prepared a highly technical diagram for other people who want to visualize this sequence of events. It would be neat to see this kind of pass in person but it's a total crapshoot what happens every night.

[Image: o1iSfsW.jpg]


RE: ION - Waterloo Region's Light Rail Transit - ijmorlan - 02-26-2020

(02-26-2020, 11:26 AM)Bob_McBob Wrote:
(02-26-2020, 08:23 AM)ijmorlan Wrote: 23:16 - I wonder where 508 was when 512 asked to proceed immediately? I can’t tell for sure but it’s entirely possible 508 was already in the single-track segment, meaning somebody would have to wait because of the single track, never mind the freight crossing through Uptown.

23:35 - 506 went on the usual southbound track? I’m just wondering because if 512 had arrived northbound, 506 could have reverse-run on the northbound track.

At 23:16, 508 was just crossing over to reverse run at Northfield, so 512 wouldn't have been able to use the regular northbound track, and I assume the other track was locked out for CN. At 23:35, 506 departed Northfield using the regular southbound track just as 512 arrived on the regular northbound track, so CN must have already switched to the third track and crossed Northfield. I've prepared a highly technical diagram for other people who want to visualize this sequence of events. It would be neat to see this kind of pass in person but it's a total crapshoot what happens every night.

Thanks! During the free week I managed to catch a reverse-running LRV to see how that worked. Some nights it would be pretty interesting to hang out on Northfield Station platform or at Erb and Caroline.


RE: ION - Waterloo Region's Light Rail Transit - ZEBuilder - 02-27-2020

The ion is not running between mill and fairway. The shuttle busses at block line are full heading towards Conestoga. It took well over twenty minutes for the first shuttle bus to start heading towards mill. They need to solve the problem of getting replacement shuttles into service and not wait until a bus ends it route.


RE: ION - Waterloo Region's Light Rail Transit - Momo26 - 02-27-2020

It was already delayed about one and a half to two train's worth of time this morning leaving Fairway (~17 to 20mins). I experienced 5 or 6 mins delay personally which was plenty in the frigid cold. No explanation 'no real time data available' written on the displays. Had to call GRT. Dozen+ people huddled in a tiny shelter that does not block wind well, + about another dozen on the platform. Standing room only and no room to navigate by about Market Station.


RE: ION - Waterloo Region's Light Rail Transit - Bob_McBob - 02-27-2020

Some of the delays this morning were so bad they actually had a train at Waterloo Town Square 30 minutes behind proceed to the crossover and then just turn around and go southbound instead. Is this all weather-related or what? Listening on the scanner for a couple hours this morning, there are so many malfunctioning gates. One e-brake near-miss with a pedestrian, truck blocking the tracks, car under a gate...