Waterloo Region Connected
American Block Redevelopment | 3 fl | U/C - Printable Version

+- Waterloo Region Connected (https://www.waterlooregionconnected.com)
+-- Forum: Land Development and Real Estate (https://www.waterlooregionconnected.com/forumdisplay.php?fid=4)
+--- Forum: Urban Areas (https://www.waterlooregionconnected.com/forumdisplay.php?fid=5)
+--- Thread: American Block Redevelopment | 3 fl | U/C (/showthread.php?tid=488)

Pages: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17


RE: American Block Redevelopment | 3 fl | Proposed - GtwoK - 01-17-2018

Anyone know what the timeline is for this development? Have the demolition permits been approved, even?

Subsequently, does anyone know if this property has a basement? I figured som rudimentary information like that might be available on GIS, but apparently not


RE: American Block Redevelopment | 3 fl | Proposed - panamaniac - 08-08-2018

Finally, a workable plan for the American Hotel block?

https://www.therecord.com/news-story/8807652-demand-for-brick-and-beam-office-drives-reno-of-old-hotel/


RE: American Block Redevelopment | 3 fl | Proposed - rangersfan - 08-08-2018

Here's hoping something happens this time!


RE: American Block Redevelopment | 3 fl | Proposed - tomh009 - 08-09-2018

Promising! Vive is really becoming a major player in DTK, I think they are up to six or seven projects now (some complete and others in planning phases).


RE: American Block Redevelopment | 3 fl | Proposed - panamaniac - 12-20-2018

Has there been any indication of when renovations might begin?


RE: American Block Redevelopment | 3 fl | Proposed - panamaniac - 12-28-2018

Renovation work is underway.


RE: American Block Redevelopment | 3 fl | Proposed - panamaniac - 03-28-2019

There has been no comment about this one for three months. Is work ongoing or has it stalled?


RE: American Block Redevelopment | 3 fl | Proposed - tomh009 - 07-07-2019

(03-28-2019, 10:30 AM)panamaniac Wrote: There has been no comment about this one for three months.  Is work ongoing or has it stalled?

There are now new signs in the windows. It does appear that this will be largely limited to interior renovations for now.

   

   


RE: American Block Redevelopment | 3 fl | Proposed - taylortbb - 10-18-2019

Some signs of progress today. Scaffolding going up, appeared to be along the full length of the Queen St side.

   


RE: American Block Redevelopment | 3 fl | Proposed - GtwoK - 11-20-2019

Are any plans for a taller addition to this dead? There was a small mention in an older Record article, with this image:

[Image: B823576666Z.1_20171004125742_000_GAM1VE9...rtrait.jpg]

And I remember some renders from the city (for the Queen St re-scape, I think?) showing a 3 story glass addition on top, with the entire Goudies Lane-facing side being made of all glass.


RE: American Block Redevelopment | 3 fl | Proposed - taylortbb - 11-20-2019

(11-20-2019, 09:53 PM)GtwoK Wrote: Are any plans for a taller addition to this dead? There was a small mention in an older Record article, with this image:

I believe they are dead. That older plan wasn't so much an addition, as a demolition with facade preservation. It was intended to be residential. Instead it's turned into an office project, keeping the existing structure.


RE: American Block Redevelopment | 3 fl | Proposed - panamaniac - 11-21-2019

Is the exterior work continuing?


RE: American Block Redevelopment | 3 fl | Proposed - robdrimmie - 11-21-2019

There's scaffolding around the entire building, so I think so. It's difficult to tell what, if anything, is actually happening underneath though.


RE: American Block Redevelopment | 3 fl | Proposed - KevinL - 11-21-2019

It looks like the back wall facing the laneway has been pulled away to some extent; I caught a quick glimpse from the Ion.


RE: American Block Redevelopment | 3 fl | Proposed - tomh009 - 11-21-2019

(11-21-2019, 12:01 PM)robdrimmie Wrote: There's scaffolding around the entire building, so I think so. It's difficult to tell what, if anything, is actually happening underneath though.

It looks like there is some brick repair/repointing being done. But what else will be done?