Waterloo Region Connected
199-205 Albert St | 81m | 24 fl | U/C - Printable Version

+- Waterloo Region Connected (https://www.waterlooregionconnected.com)
+-- Forum: Land Development and Real Estate (https://www.waterlooregionconnected.com/forumdisplay.php?fid=4)
+--- Forum: University Area (https://www.waterlooregionconnected.com/forumdisplay.php?fid=6)
+--- Thread: 199-205 Albert St | 81m | 24 fl | U/C (/showthread.php?tid=480)

Pages: 1 2 3 4 5


RE: 199-205 Albert St | 81m | 24 fl | Proposed - Rainrider22 - 01-24-2020

I cant believe how ugly those buildings are....


RE: 199-205 Albert St | 81m | 24 fl | Proposed - timc - 01-25-2020

(01-24-2020, 06:02 PM)Rainrider22 Wrote: I cant believe how ugly those buildings are....

It's actually worse when the morning sun hits them.


RE: 199-205 Albert St | 81m | 24 fl | Proposed - jwilliamson - 03-02-2020

   

The site has been completely scraped bare.

(Sorry for the rotation)


RE: 199-205 Albert St | 81m | 24 fl | Proposed - jwilliamson - 04-01-2020

Wooden fencing is up.
   


RE: 199-205 Albert St | 81m | 24 fl | Proposed - jwilliamson - 05-20-2020

There was an excavator on site yesterday. I was biking on Albert so I couldn't see if they've started digging.


RE: 199-205 Albert St | 81m | 24 fl | Proposed - jwilliamson - 06-11-2020

Lots of supplies on site for shoring, but not much activity.

   


RE: 199-205 Albert St | 81m | 24 fl | Proposed - jwilliamson - 10-25-2020

   

Not much visible progress here.


RE: 199-205 Albert St | 81m | 24 fl | Proposed - ac3r - 10-26-2020

Doesn't look like anything has happened since there was snow on the ground in the previous photo.


RE: 199-205 Albert St | 81m | 24 fl | Proposed - jwilliamson - 11-11-2020

The site was excavated to around a storey below ground when I ran by last night.


RE: 199-205 Albert St | 81m | 24 fl | U/C - white_brian - 11-30-2020

Crane base on site with mobile crane


RE: 199-205 Albert St | 81m | 24 fl | U/C - jwilliamson - 01-28-2021

There was a large Mammoet crane on site last night. The tower crane is probably going up in the next few days.


RE: 199-205 Albert St | 81m | 24 fl | U/C - jwilliamson - 02-01-2021

Crane is up.


RE: 199-205 Albert St | 81m | 24 fl | U/C - Lebronj23 - 03-13-2021

Concrete pumper is at work currently, pouring the footings?


RE: 199-205 Albert St | 81m | 24 fl | U/C - jwilliamson - 04-04-2021

   


RE: 199-205 Albert St | 81m | 24 fl | U/C - jwilliamson - 06-26-2021