Cycling in Waterloo Region - Printable Version +- Waterloo Region Connected (https://www.waterlooregionconnected.com) +-- Forum: Waterloo Region Works (https://www.waterlooregionconnected.com/forumdisplay.php?fid=14) +--- Forum: Transportation and Infrastructure (https://www.waterlooregionconnected.com/forumdisplay.php?fid=25) +--- Thread: Cycling in Waterloo Region (/showthread.php?tid=186) Pages:
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
|
RE: Cycling in Waterloo Region - jamincan - 08-17-2021 Quote:KITCHENER — A fatal collision near Elmira has led to an unusual outcome, with no jail for a 19-year-old driver who killed cyclist Lewis Martin, 18, and then drove off after calling 911. Kudos for Jeff Outhit, for actually saying the driver killed the cyclist. In this case, it seems like the outcome is with the blessing of the family of the victim, and the driver seems truly remorseful. He definitely deserves far more than he got, but I would be sad if there was no room for forgiveness and mercy in our justice system. RE: Cycling in Waterloo Region - EdM - 08-18-2021 Cyclist killed in Toronto in a location that had repeated complaints over the last couple of days about unsafe construction diversion, heartbreaking and infuriating. https://twitter.com/DaveLikesBikes/status/1428124433814888448 RE: Cycling in Waterloo Region - timc - 08-19-2021 Why does that bike lane have sharrows? RE: Cycling in Waterloo Region - danbrotherston - 08-20-2021 Looks like the Laurel Trail will be keeping its choke point. My consternation is expressed in the tweets. Engineering malpractice I believe applies even for the usual things our engineers claim to actually be good at which is traffic growth forecasting and smoothly flowing traffic. It is clear the prejudice is explicitly only motorvehicles. But this is no surprise, they have explicitly said this before. And in fairness, this is with the approval of some of council...who pretend...by passing strategy and planning docs which they then explicitly contradict. They know how to play politics, I'll give them that. RE: Cycling in Waterloo Region - catarctica - 08-21-2021 Could I ask how the downtown grid is coming along? I was passing by the Market district last week and haven’t seen constructions started RE: Cycling in Waterloo Region - dtkvictim - 08-21-2021 (08-21-2021, 01:11 PM)catarctica Wrote: Could I ask how the downtown grid is coming along? I was passing by the Market district last week and haven’t seen constructions started Joseph St seemed to start off quickly, but still isn't done. It's been moving at a frustratingly slow pace. The center curb has been in place for ages, some of the intersections are painted, a very small portion of the lane is painted, I think most signs are in, lights were removed and re-installed at Water St (might be an unrelated project?). There is still a chunk of the bike lane and sidewalk completely missing around Water St though. I think there must be a utilities/hydro project taking place at Joseph/Water that is preventing this lane from wrapping up. I'm not aware of any other parts of the grid that are under way aside from random streets with sharrows (which as far as I'm concerned, isn't part of the grid, because it's not infrastructure...). I can try and grab photos soon. RE: Cycling in Waterloo Region - taylortbb - 08-21-2021 I think Joseph St and Water St are the only parts of the cycling grid that are supposed to be done this year, and Cafe Pyrus got the Water St section deferred until the fall. RE: Cycling in Waterloo Region - dtkvictim - 08-21-2021 Some photo updates (sorry, didn't go all the way to Victoria, but from what I saw the other day everything that direction is still missing lane markings, and the Victoria St intersection is still partially unfinished). Joseph & Water Gaukel St Section with lane markings, near Queen St. RE: Cycling in Waterloo Region - ac3r - 08-22-2021 I see you passed Anita, or whatever her name is. I was surprised to see that section at Water Street not done yet. I thought it was all finished, save for some touching up on the asphalt but then when I got to Water Street there was that entire section missing. RE: Cycling in Waterloo Region - clasher - 08-22-2021 It's kinda frustrating how long it takes these contractors to do this work... like the bridge replacement in Victoria Park has been dragging on for months, probably been less than 2 weeks of actual work on it since the spring. RE: Cycling in Waterloo Region - jamincan - 08-22-2021 On the other hand, work on the 401 in Cambridge and Milton has been proceeding at a blistering pace. RE: Cycling in Waterloo Region - dtkvictim - 08-22-2021 (08-22-2021, 12:18 PM)clasher Wrote: It's kinda frustrating how long it takes these contractors to do this work... like the bridge replacement in Victoria Park has been dragging on for months, probably been less than 2 weeks of actual work on it since the spring. Agreed. I'm upset about how slow this is moving, because I just want to use it. But more importantly, both of these projects have created accessibility problems. All four corners of Joseph/Water have been without pedestrian access for ages now. The Victoria park bridge replacement has left that section of the path closed, forcing people over a grass hill that is likely too steep for certain people (at the very least, annoying). There doesn't seem to be any concern about prolonging these issues, if any consideration was even given to them in the first place. RE: Cycling in Waterloo Region - tomh009 - 08-22-2021 (08-22-2021, 12:46 PM)dtkvictim Wrote:(08-22-2021, 12:18 PM)clasher Wrote: It's kinda frustrating how long it takes these contractors to do this work... like the bridge replacement in Victoria Park has been dragging on for months, probably been less than 2 weeks of actual work on it since the spring. The Joseph St project is particularly puzzling as it seems they'll do half a day of work, and then nothing for a week or so. The MUT is still AWOL at Water St, and much of the lane markings are missing. It's surely not a lot of work remaining. Are they doing this as a "spare time" project or something, with super low priority? The Victoria Park bridge was waiting for a contractor for maybe two or three weeks, but they have now poured the concrete footings for the new bridge so I am (against all odds) optimistic that the pace will pick up soon. RE: Cycling in Waterloo Region - danbrotherston - 08-23-2021 (08-22-2021, 04:57 PM)tomh009 Wrote:(08-22-2021, 12:46 PM)dtkvictim Wrote: Agreed. I'm upset about how slow this is moving, because I just want to use it. But more importantly, both of these projects have created accessibility problems. All four corners of Joseph/Water have been without pedestrian access for ages now. The Victoria park bridge replacement has left that section of the path closed, forcing people over a grass hill that is likely too steep for certain people (at the very least, annoying). There doesn't seem to be any concern about prolonging these issues, if any consideration was even given to them in the first place. I don't know the details, but at Joseph and Water, steed and Evans (the contractor for the grid) is waiting on the hydro utility to do underground work. I have no idea what that underground work is, it doesn't even seem entirely related to the grid. But they don't seem to be in a hurry about it. The MUT and other parts may be left till another year, and Water St itself has been deferred until after patio season. RE: Cycling in Waterloo Region - catarctica - 08-23-2021 That looks great. Thank you so much! |