General Urban Kitchener Updates and Rumours - Printable Version +- Waterloo Region Connected (https://www.waterlooregionconnected.com) +-- Forum: Land Development and Real Estate (https://www.waterlooregionconnected.com/forumdisplay.php?fid=4) +--- Forum: Urban Areas (https://www.waterlooregionconnected.com/forumdisplay.php?fid=5) +--- Thread: General Urban Kitchener Updates and Rumours (/showthread.php?tid=8) Pages:
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
|
RE: General Urban Kitchener Updates and Rumours - panamaniac - 06-16-2020 (06-16-2020, 08:30 PM)KevinL Wrote: That asphalt HAS to be temporary. Nobody makes a permanent sidewalk from asphalt, it's not done. And I doubt the Walper would agree with it. I think you’re probably right. It seems odd that they wouldn’t have used the opportunity to recess the ramp. RE: General Urban Kitchener Updates and Rumours - REnerd - 06-17-2020 Amazing to see in the context of today (pandemic days) that the city designers choose to allocate space to a turning lane instead of a sidewalk. Sidewalk at Charles has to be less than a metre between poles and building. Also the paving machines destroyed the decorative cross walk, which were new last year? Hopefully the contractor is held accountable to fix that. RE: General Urban Kitchener Updates and Rumours - danbrotherston - 06-17-2020 (06-17-2020, 07:32 AM)REnerd Wrote: Amazing to see in the context of today (pandemic days) that the city designers choose to allocate space to a turning lane instead of a sidewalk. Sidewalk at Charles has to be less than a metre between poles and building. To be fair, city planners/transportation engineers haven't looked at this since around 2017...plans for this reconstruction have been in the works for 5 years, it was supposed to have been paved last year or even the year before. RE: General Urban Kitchener Updates and Rumours - cherrypark - 06-17-2020 (11-09-2019, 04:55 PM)KevinL Wrote:panamaniac Wrote:Vacant lot between the tracks and Victoria? Not a big development, but interestingly this lot had basically every tree clear cut as of yesterday. Not sure what spurred it unless it was just some clean up by someone who acquired it. Gravel drive laid down and some digging happening at the site. RE: General Urban Kitchener Updates and Rumours - tomh009 - 06-26-2020 165 Courtland Ave E has been demolished. A narrow, very long lot (about 18 m wide x 120 m deep) which seems best suited for a townhouse complex. I think these urban townhouses are the answer to the question about the lack of larger apartments in high-rise buildings. RE: General Urban Kitchener Updates and Rumours - panamaniac - 06-26-2020 (06-26-2020, 11:22 AM)tomh009 Wrote: 165 Courtland Ave E has been demolished. A narrow, very long lot (about 18 m wide x 120 m deep) which seems best suited for a townhouse complex. Do I recall correctly that we've seen details of a proposal for that site, as some point in the past couple of years? RE: General Urban Kitchener Updates and Rumours - tomh009 - 06-26-2020 (06-26-2020, 02:17 PM)panamaniac Wrote:(06-26-2020, 11:22 AM)tomh009 Wrote: 165 Courtland Ave E has been demolished. A narrow, very long lot (about 18 m wide x 120 m deep) which seems best suited for a townhouse complex. I was trying to remember, but I couldn't find anything. RE: General Urban Kitchener Updates and Rumours - jeffster - 06-26-2020 (06-26-2020, 03:05 PM)tomh009 Wrote:(06-26-2020, 02:17 PM)panamaniac Wrote: Do I recall correctly that we've seen details of a proposal for that site, as some point in the past couple of years? I thought there was, a couple years ago, IIRC, a 6 storey apartment, which I believe got cancelled due to NIMBY's busting into council meetings. RE: General Urban Kitchener Updates and Rumours - tomh009 - 06-27-2020 I think the current zoning only allows three stories. Although there is a four-storey (I think it's four) retirement building next door ... RE: General Urban Kitchener Updates and Rumours - white_brian - 06-27-2020 When the old lady that lived there passed away the property was taken over by the retirement home. There had been an agreement years back RE: General Urban Kitchener Updates and Rumours - panamaniac - 06-27-2020 So most likely an expansion? BTW, is the existing place a retirement home or seniors’ apartments? RE: General Urban Kitchener Updates and Rumours - tomh009 - 06-28-2020 Hopefully not just extra parking! But this makes sense, the retirement complex (it's really seniors' apartments, not an LTC facility) also has a very deep lot that is essentially only used for parking. Hopefully that's not the church's plan, and they will either build more seniors' apartments or affordable housing (almost half of the current 41 units are subsidized/affordable). A 16m available width provides much more flexibility, even if it might necessitate the construction of some structured parking. The current building's property is zoned CR-2, but the new one is CR-1 so they would need a zoning change on that one. RE: General Urban Kitchener Updates and Rumours - panamaniac - 06-28-2020 The church on Madison bought the site? RE: General Urban Kitchener Updates and Rumours - tomh009 - 06-28-2020 I do believe that church owns the retirement apartment building, yes. RE: General Urban Kitchener Updates and Rumours - panamaniac - 06-28-2020 (06-28-2020, 02:30 PM)tomh009 Wrote: I do believe that church owns the retirement apartment building, yes. Which church? The one on Madison or St Joe’s? |