Waterloo Region Connected
ION - Waterloo Region's Light Rail Transit - Printable Version

+- Waterloo Region Connected (https://www.waterlooregionconnected.com)
+-- Forum: Waterloo Region Works (https://www.waterlooregionconnected.com/forumdisplay.php?fid=14)
+--- Forum: Transportation and Infrastructure (https://www.waterlooregionconnected.com/forumdisplay.php?fid=25)
+--- Thread: ION - Waterloo Region's Light Rail Transit (/showthread.php?tid=14)

Pages: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353 354 355 356 357 358 359 360 361 362 363 364 365 366 367 368 369 370 371 372 373 374 375 376 377 378 379 380 381 382 383 384 385 386 387 388 389 390 391 392 393 394 395 396 397 398 399 400 401 402 403 404 405 406 407 408 409 410 411 412 413 414 415 416 417 418 419 420 421 422 423 424 425 426 427 428 429 430 431 432 433 434 435 436 437 438 439 440 441 442 443 444 445 446 447 448 449 450 451 452 453 454 455 456 457 458 459 460 461 462 463 464 465 466 467 468 469 470 471 472 473 474 475 476 477 478 479 480 481 482 483 484 485 486 487 488 489 490 491 492 493 494 495 496 497 498 499 500 501 502 503 504 505 506 507 508 509 510 511 512 513 514 515 516 517 518 519 520 521 522 523 524 525 526 527 528 529 530 531 532 533 534 535 536 537 538 539 540 541 542 543 544 545 546 547 548 549 550 551 552 553 554 555 556 557 558 559 560 561 562 563 564 565 566 567 568 569 570 571 572 573 574 575 576 577 578 579 580 581 582 583 584 585 586 587 588 589 590 591 592 593 594 595 596 597 598 599 600 601 602 603 604 605 606 607 608 609 610 611 612 613 614 615 616 617 618 619 620 621 622 623 624 625 626 627 628 629 630 631 632 633 634 635 636 637 638 639 640 641 642 643 644 645 646 647 648 649 650 651 652 653 654 655 656 657 658 659 660 661 662 663 664 665 666 667 668 669 670 671 672 673 674 675 676 677 678 679 680 681 682 683 684 685 686 687 688 689 690 691 692 693 694 695 696 697 698 699 700 701 702 703 704 705 706 707 708 709 710 711 712 713 714 715 716 717 718 719 720 721 722 723 724 725 726 727 728 729 730 731 732 733 734 735 736 737 738 739 740 741 742 743 744 745 746 747 748 749 750 751 752 753 754 755 756 757 758 759 760 761 762 763 764 765 766 767 768 769 770 771 772 773 774 775 776 777 778 779 780 781 782 783 784 785 786 787 788 789 790 791 792 793 794 795 796 797 798 799 800 801 802 803 804 805 806 807 808 809 810 811 812 813 814 815 816 817 818 819 820 821 822 823 824 825 826 827 828 829 830 831 832 833 834 835 836 837 838 839 840 841 842 843 844 845 846 847 848 849 850 851 852 853 854 855 856 857 858 859 860 861 862 863 864 865 866 867 868 869 870 871 872 873 874 875 876 877 878 879 880 881 882 883 884 885 886 887 888 889 890 891 892 893 894 895 896 897 898 899 900 901 902 903 904 905 906 907 908 909 910 911 912 913 914 915 916 917 918 919 920 921 922 923 924 925 926 927 928 929 930 931 932 933 934 935 936 937 938 939 940 941 942 943 944 945 946 947 948 949 950 951 952 953 954 955 956 957 958 959 960 961 962 963 964 965 966 967 968 969 970 971 972 973 974 975 976 977 978 979 980 981 982 983 984 985 986 987 988 989 990 991 992 993 994 995 996 997 998 999 1000 1001 1002 1003 1004 1005 1006 1007 1008 1009 1010 1011 1012 1013 1014 1015 1016 1017 1018 1019 1020 1021 1022 1023 1024 1025 1026 1027 1028 1029 1030 1031 1032 1033 1034 1035 1036 1037 1038 1039 1040 1041 1042 1043 1044 1045 1046 1047 1048 1049 1050 1051 1052 1053 1054 1055 1056 1057 1058 1059 1060 1061 1062 1063 1064 1065 1066 1067 1068 1069 1070 1071 1072 1073 1074 1075 1076 1077 1078 1079 1080 1081 1082 1083 1084 1085 1086 1087 1088 1089 1090 1091 1092 1093 1094 1095 1096 1097 1098 1099 1100 1101 1102 1103 1104 1105 1106 1107 1108 1109 1110 1111 1112 1113 1114 1115 1116 1117 1118 1119 1120 1121 1122 1123 1124 1125 1126 1127 1128 1129 1130 1131 1132 1133 1134 1135 1136 1137 1138 1139 1140 1141 1142 1143 1144 1145 1146 1147 1148 1149 1150 1151 1152 1153 1154 1155 1156 1157 1158 1159 1160 1161 1162 1163 1164 1165 1166


RE: ION - Waterloo Region's Light Rail Transit - ijmorlan - 11-27-2019

(11-27-2019, 04:25 AM)Square Wrote: I saw a worker cleaning out one yesterday.  Probably clogged and grease not coming out?

Yes, I also heard lots of screeching on my travels yesterday.

I saw some workers examining the poorly-placed one in Waterloo Town Square parking lot. I hope they were considering ways to correct its location.


RE: ION - Waterloo Region's Light Rail Transit - Acitta - 11-27-2019

Op-ed in the Record by Kurtis McBride, the chief executive officer of Miovision

Vehicle-centric planning won’t lead to more efficient travel

I don't know if there is a more general forum appropriate for this post.


RE: ION - Waterloo Region's Light Rail Transit - jeffster - 11-27-2019

(11-27-2019, 12:27 PM)Acitta Wrote: Op-ed in the Record by Kurtis McBride, the chief executive officer of Miovision

Vehicle-centric planning won’t lead to more efficient travel

I don't know if there is a more general forum appropriate for this post.

General Roads and Highway Discussion? Not sure if that's a better fit.


RE: ION - Waterloo Region's Light Rail Transit - Bob_McBob - 11-27-2019

I didn't realize the CN freight train can cause significant delays in ION service while it shares the track. Someone on Reddit says they were held at Waterloo Public Square station for 15 minutes while the freight train passed through last night. For some reason I assumed it would be a little more optimized than that.


RE: ION - Waterloo Region's Light Rail Transit - taylortbb - 11-27-2019

(11-27-2019, 04:06 PM)Bob_McBob Wrote: I didn't realize the CN freight train can cause significant delays in ION service while it shares the track. Someone on Reddit says they were held at Waterloo Public Square station for 15 minutes while the freight train passed through last night. For some reason I assumed it would be a little more optimized than that.

The original plan was for ION service to be every 30mins after about 10pm weekdays/6pm weekends, which gave enough time for the train to pass through. With the upgrade to an every 15mins service at all times this was the result.

The region's lease with the freight railway gives the region the right to terminate it if freight operations interfere with ION, but I think the current situation will be maintained for a while.


RE: ION - Waterloo Region's Light Rail Transit - KevinL - 11-27-2019

Can the freight movements be moved later into the evening, such as after the end of Ion service?


RE: ION - Waterloo Region's Light Rail Transit - taylortbb - 11-27-2019

(11-27-2019, 05:44 PM)KevinL Wrote: Can the freight movements be moved later into the evening, such as after the end of Ion service?

That was the even earlier plan, but I believe CN advised that doing so wasn't feasible for them. The last ION trains return to the OMSF around 2am, and the first ones leave around 4:15am. That's a pretty small window to get up to Elmira, do their coupling and uncoupling, and make it back down.

Of course if they did two trains, and built a passing siding by St Jacobs, it probably could be done. But that's expensive for serving one customer.


RE: ION - Waterloo Region's Light Rail Transit - ijmorlan - 11-27-2019

(11-27-2019, 05:44 PM)KevinL Wrote: Can the freight movements be moved later into the evening, such as after the end of Ion service?

My understanding is that freight operations are allowed to send one train northbound between 23:00 and 01:00. From 01:00 to 05:00 freight has more or less unfettered use of its track. In practice, it’s a single southbound train somewhere around 04:00 or so.

This ties into the design of the interlocking. It is designed so that, short of sabotage, it is impossible for a freight train to enter track that is currently reserved for LRT. Before the derails can disengage, the LRT signals have to be set to red and the switches have to be aligned to take the freight through uptown, across the crossover at the Perimeter Institute, up the southbound LRT track, and onto the freight track where it branches off at Northfield. This implies that the LRT system is disconnected while this is happening.

I’m a bit unclear on some details. In particular, I don’t know how far the northbound freight has to get before the switches through Uptown can be moved to allow LRT to move. I would hope that once the freight has cleared the freight crossover, any southbound LRT waiting on the northbound track would be able to proceed across the LRT crossover and down to Willis Way; but maybe the freight has to get further than that (conceivably, it could be required to clear the derail at Northfield, although this would go beyond good safety planning and well into the realm of paranoia).

For southbound trains, my understanding is that LRT runs 3 south to Fairway before 05:00, starting at about 04:20. The first deadheads while the next 2 come into service at R&T. At this time there is no northbound service, because that can’t happen until the first LRT gets back from Fairway, which happens around 05:30. So the northbound LRT track can be used and the only interaction with freight is at the double crossover at the Perimeter Institute. My hope is that the freight would wait in the park for its turn; it should be possible for this movement not to cause noticeable impact on those early LRT runs. However, I have an idea that they might have to line up the entire route all the way through Uptown before the freight can come south of Northfield. I don’t know what time the freight actually goes through however; it may be that in practice they’re usually gone by the time first LRT goes out.

One thing I would like to know more about is how the freight spends its time. I think it takes about 4-5 hours to make the round trip from Uptown to Elmira and back. This seems like a lot of time, even with a certain amount of coupling and uncoupling of cars and with the slow speed at which they travel. So I wish I knew more about what specifically takes up the time. Maybe they are performing more individual actions than I realize, or maybe each one takes longer than I think, or maybe something else.


RE: ION - Waterloo Region's Light Rail Transit - ijmorlan - 11-27-2019

(11-27-2019, 06:17 PM)taylortbb Wrote: Of course if they did two trains, and built a passing siding by St Jacobs, it probably could be done. But that's expensive for serving one customer.

Actually there are several customers:

Commonwealth Plywood at Northfield (although this may be a defunct siding; they used it to store incoming LRVs)

Fairway Lumber Home Building Centre in St. Jacobs (weirdly, though, not the massive distribution centre just a few blocks north)

Canada Colors and Chemicals

Chemtura (which Google Maps seems to be suggesting is now Lanxess)

But your main point is still valid - it’s 4 trains per week in each direction, pulling 1-15 cars, usually closer to the middle of that range. I’m actually moderately amazed that it still makes sense to maintain the line at that traffic level, although I have an idea that tanker cars have an inconveniently and surprisingly large capacity for transferring the load to highway transportation.


RE: ION - Waterloo Region's Light Rail Transit - Acitta - 11-27-2019

The train crosses King St. very slowly and employs a flag man during the crossing (at least it did during the times I followed it during LRV delivery). This may account for the long delay.


RE: ION - Waterloo Region's Light Rail Transit - KevinL - 11-27-2019

I think it's also the nature of some of the chemicals, that rail is considered more reliable than road. A tanker car can't jackknife on a highway and spill its load into mixed traffic.


RE: ION - Waterloo Region's Light Rail Transit - nms - 11-27-2019

The round trip from King St in Waterloo to Erb St in Elmira (yes, there is an Erb St up there) takes about 2 hours (or one hour one-way). This would not include any stops to pick up or drop off cars. Track speed is defined by the track geography and condition. The track condition doesn't really allow for anything above 15 mph.

Dropping off and/or picking cars is a fairly complicated process depending on which cars need to be dropped off or collected. The first problem is "where are they" (ie are they the last in line, behind some other ones) and then next is the puzzle of pushing and pulling while leaving enough time for air brakes to charge throughout the whole trainset before it is moved each time.


RE: ION - Waterloo Region's Light Rail Transit - bgb_ca - 11-27-2019

Real time for ion is now working in google maps


RE: ION - Waterloo Region's Light Rail Transit - Rainrider22 - 11-28-2019

(11-27-2019, 11:17 PM)bgb_ca Wrote: Real time for ion is now working in google maps
How do I do that ?


RE: ION - Waterloo Region's Light Rail Transit - robdrimmie - 11-28-2019

One of the blue signs with a white chevron, pointing up, has been added to the left side of the track approaching Mill Station towards Fairview, in the stretch between Ottawa and Borden. It's a fairly new addition, I saw it last night for the first time, but I hadn't been on the tram since last Friday so I'm not sure when it was added.

While on the train I thought that perhaps there was a slight climb there, so I played around with Google Maps' cycling directions to experiment with elevations. Unfortunately the walkway that runs parallel to the tracks between Borden Ave and Ottawa isn't in Google Maps yet, so I don't have clear elevation information. Ottawa and Mill is a little bit lower than Mill at Borden Pkwy but a little bit higher than Ottawa at Courtland but in all cases it's only a few metres either way.